Principal Investigator:Fletcher, Alana Licensed Year(s):
2015
2014 Summary:
The major objective of this proposed 2015 fieldwork is twofold. Firstly, the principle investigator (PI) aims to conduct a comprehensive literature review of the mining- and environment-related materials held at the Déline Land Corporation in order to enrich their understanding of this history as it is understood by the community. Secondly, the PI wants to assist in the creation of a real archive ...
Principal Investigator:Wells, David A Licensed Year(s):20242023202220212019201820172016
2015
2014201320122011201020092008200720052004200320022001 Summary:
The objective of this research is to revisit fixed sample stations at near-field, mid-field and far-field sites over the course of the year in an effort to determine any seasonal variation that may exist and confirm impact predictions.
The AEMP Version 3.5 will consist of the following components; Dust Deposition; Effluent and Water Chemistry; Indicators of Eutrophication; Sediment Chemistry; P...
Principal Investigator:Elliott, Barrett R Licensed Year(s):2017
2015
Summary:
The Northwest Territories Geoscience Office in the Department of Industry, Tourism and Investment (ITI) has developed a large collaborative research project to determine the detailed glacial history and permafrost conditions of the central Slave Geological Province.
The project goals are to:
- stimulate the next round of diamond and metals exploration in the Slave Province
- collect permafr...
Principal Investigator:Wilcockson, John B Licensed Year(s):
2014
2013 Summary:
To collect baseline aquatic data in advance of the development of the Prairie Creek Mine. The study will be part of the Aquatic Effects Monitoring Program (AEMP) and will satisfy the requirements of the federal Environmental Effects Monitoring (EEM).
The description below is a summary of the planned methodology. Most work will be carried out on Prairie Creek; however, sampling will also be con...
Principal Investigator:Robb, Tonia L Licensed Year(s):
2013
2012201120102009200820072006200520042003 Summary:
The main objectives of the field work for 2009 to 2013 will be to determine if the EKATI mine is having an effect on the surrounding aquatic environment and air quality to provide baseline data for areas where mine development may occur in the future.
In winter, water samples will be collected under ice using a 5L Niskin (a cylindrical PVC water sampler).
During the week of spring freshet, hy...
Principal Investigator:Sibbald, Carey Licensed Year(s):
2012
2011201020092008 Summary:
The objective of the 2012 Aquatics program is to continue baseline data collection to further characterize the baseline water and sediment quality and aquatic communities at specific lakes within the Thor Lake area and Avalon's Thor Lake Rare Earth Elements Project footprint.
Water, sediment and aquatic organisms will be collected at up to 11 stations (10 lakes) within the Thor Lake area. Most ...
Principal Investigator:Farrell, Rory Licensed Year(s):
2012
Summary:
The objective of this research is to take specific samples for the completion of a remedial action plan and risk assessment for the Five Mine Sites.
The field component of the project will be conducted over a two day period.
Limited soil and mine tailing samples from the most contaminated areas of the site will be taken. These areas were previously identified in past environmental site asses...
Principal Investigator:Bathe, Adam Licensed Year(s):
2012
Summary:
Blyth & Bathe Inc purposes to conduct a Traditional Knowledge study that will serve as a starting point for the commencement of Devonian Metals’ environmental and socio-economic research, and will greatly improve the quality of data produced by the studies leading up to and during the permitting process.
Blyth & Bathe Inc, in conjunction with the Pehdzeh Ki First Nation (PKFN liaison), will dev...
Principal Investigator:Trusler, Scott Licensed Year(s):
2012
2008 Summary:
The objectives of the research studies are the following: refine understanding of baseline conditions; provide input to design mitigation; evaluate potential changes in the environment in relation to the Izok Project; and contribute to the ongoing data collection of the Arctic environment.
The Minerals and Metals Group (MMG) Canada team of environmental consultants will collect and review exist...
Principal Investigator:Purdy, Colin Licensed Year(s):
2012
Summary:
The objective of this study is to determine what controls whether rare earth elements are mobile under low temperature and moderate to high pH conditions.
Four 55 gallon barrels cut in half will be set up at Thor Lake with mine tailings in them. The tailings will be allowed to weather in the local environment. Samples of the tailings and waters in them will be sampled at the beginning, and then...