Principal Investigator:Panayi, Damian Licensed Year(s):20182017201620152014
2013
201220112010 Summary:
The objective of this study is to describe the terrestrial and aquatic environment in the Yellowknife River between Prosperous Lake and Bluefish Lake as per the Fisheries Authorization and the Water Licence. This may include investigating vegetation, water quality, benthic invertebrate populations, and fish. The results will be used to determine the most suitable means of fish habitat compensation...
Principal Investigator:Harris, Katherine M. Licensed Year(s):201720162014
2013
201220112010200920082006200520042003 Summary:
The objective of this research project is to collect baseline environmental information for future environmental effects monitoring.
Surveys may include assessments of fish, fish habitat, benthic invertebrates, plankton, water and sediment quality, wetlands and geochemistry. Equipment for surveys will be limited to standard field measuring and surveying equipment, such as automated water qualit...
Principal Investigator:Farrell, Rory Licensed Year(s):
2012
Summary:
The objective of this research is to take specific samples for the completion of a remedial action plan and risk assessment for the Five Mine Sites.
The field component of the project will be conducted over a two day period.
Limited soil and mine tailing samples from the most contaminated areas of the site will be taken. These areas were previously identified in past environmental site asses...
Principal Investigator:Laidlaw, Shawn Licensed Year(s):2013
2012
Summary:
The purpose of this project is to:
1) coordinate monitoring and research efforts in the watershed between the community, government, and universities;
2) understand current aquatic health of the watershed using water quality, macroinvertebrates, aquatic furbearers and fish as indicators of ecosystem health;
3) understand historical environmental change and contaminant loading in the watershe...
Principal Investigator:Wen, Marc Licensed Year(s):20132012201120102009
2008
20072006200520042003 Summary:
This research will characterize baseline and post-baseline conditions in the lakes and streams near areas of current and pending mining activity. This will be the 11th year of post-baseline data collected in the Koala Watershed and the 8th year of post-baseline data collected in the King-Cujo Watershed as a part of EKATI’s Aquatic Effects Monitoring Program. It will also be the 10th year of monito...
Principal Investigator:Bekhuys, Tim Licensed Year(s):
2006
2005 Summary:
Baseline studies in the Gahcho Kue (Kennady Lake) area, in conjunction with the DeBeers Gahcho Kue Diamond Mine Project, have been ongoing since 1998. AMEC Earth and Environmental has been contracted by DeBeers to conduct these studies. This year, independent of the Mackenzie Valley Environmental Impact Review Board's regulatory requirements*, two studies are planned to be conducted in the project...
Principal Investigator:Hoos, Rick Licensed Year(s):
2006
Summary:
The objective is to obtain sufficient baseline data to develop a lead and zinc mine adjacent to the old Pine Point property. The owl survey to identify species presence and breeding territories in the vicinity of the study area will include an evening broadcast-call program that will commence 0.5 hours after sundown to 0.5 hours before sunrise in April and May. This owl survey will target the Bor...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Uren, Shane Licensed Year(s):
2004
Summary:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
Principal Investigator:Mears, Margaret Licensed Year(s):
2002
Summary:
Baseline studies will be conducted for the proposed wellsite, access roads and other related infrastructure. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. For the...