5 record(s) found for principal investigator "Hoos, Rick" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Tyhee Hydrology and Meteorology Data Collection Project
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007
Summary: The objectives of the single site visit in 2007 are as follows: (1) to re-install instruments at the 4 existing hydrostations, so that data will be recorded automatically during the summer season; Tyhee personnel will remove the instruments (a datalogger and pressure transducer for each station location) at the end of the season, before freezeup; (2) download data from the existing weather station...


Seasonal Overland Winter Road
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007
Summary: A new 156 km winter road is proposed, extending from the end of the Ingraham Trail to Lockhart Lake, following a route similar to that of the existing winter road. The objective is to acquire airborne digital imagery (including LiDAR and digital video) data to produce maps; to determine fish presence/absence in streams around the route and fish utilization of habitat, to determine potential fish h...


MacTung Project Environmental Baseline Studies
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007 2006
Summary: The purpose of the MacTung 2006 Environmental Baseline Studies is to collect additional information regarding meteorology, hydrology, aquatic resources, vegetation, terrain and wildlife in the MacTung Project area. This baseline environmental information is required to complete the environmental assessment and regulatory applications for approval of the proposed MacTung Mine project. Overland t...


Tammerlane Baseline Studies
Principal Investigator: Hoos, Rick
Licensed Year(s): 2006
Summary: The objective is to obtain sufficient baseline data to develop a lead and zinc mine adjacent to the old Pine Point property. The owl survey to identify species presence and breeding territories in the vicinity of the study area will include an evening broadcast-call program that will commence 0.5 hours after sundown to 0.5 hours before sunrise in April and May. This owl survey will target the Bor...


Aquatic Environmental Effects Monitoring - Flat River at CanTung Mine
Principal Investigator: Hoos, Rick
Licensed Year(s): 2012 2009 2002
Summary: This work is being done to assist with the development of a future aquatic effects monitoring program for the mine that will meet the terms of the recently promulgated federal Metal Mining Effluent Regulations. The survey data will be provided in support...


TOTAL PAGES: 1