4 record(s) found for principal investigator "Panayi, Damian" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Kennady North Diamond Project
Principal Investigator: Panayi, Damian
Licensed Year(s): 2020 2019 2018 2017 2016
Summary: This licence has been issued for the scientific research application No.4787. The objective of this project is to document existing environmental conditions, in preparation for future regulatory applications. Various environmental studies will be initiated each year, according to budgets and information priorities. Hydrology studies include the measurement of selected lake inflow and outf...


Vegetation Surveys on the Old Airport Road
Principal Investigator: Panayi, Damian
Licensed Year(s): 2018
Summary: To survey a representative sample of the entire length of the Old Airport Road (i.e. disturbed areas) for invasive species and rare plants. Rare plant surveys will be conducted in accordance with the Alberta Native Plant Council (ANPC) guidelines (ANPC 2012) and the Golder Technical Procedures for Rare Plant and Rare Community Surveys. Surveys will be performed when potential rare species are m...


NTPC Bluefish Hydro Repairs
Principal Investigator: Panayi, Damian
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: The objective of the Bluefish monitoring programs are is to monitor flow, water levels, sediment deposition, and monitor fish use of the compensation habitat in Bluefish Lake, and fish use of the Yellowknife River as per the Bluefish FAA Fisheries Act Authorization and Water License. The monitoring programs at Bluefish are multiyear programs that are required under the Fisheries Act Authorizati...


Nonacho Lake Investigations for the Taltson Expansion Project
Principal Investigator: Panayi, Damian
Licensed Year(s): 2008
Summary: Objectives of the surveys will be to document locations of snowmobile travel routes, record snow depth, ice thickness, presence of overflow, and presence of hanging ice and thickness of air pocket if present. The Deze Energy Corporation is planning to construct the Taltson Expansion Project, which would supply diamond mines with hydroelectricity from the Twin Gorges facility on the Taltson Rive...


TOTAL PAGES: 1