4 record(s) found for principal investigator "Panayi, Damian" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Vegetation Surveys on the Old Airport Road
Principal Investigator: Panayi, Damian
Licensed Year(s): 2018
Summary: To survey a representative sample of the entire length of the Old Airport Road (i.e. disturbed areas) for invasive species and rare plants. Rare plant surveys will be conducted in accordance with the Alberta Native Plant Council (ANPC) guidelines (ANPC 2012) and the Golder Technical Procedures for Rare Plant and Rare Community Surveys. Surveys will be performed when potential rare species are m...


Kennady North Diamond Project
Principal Investigator: Panayi, Damian
Licensed Year(s): 2020 2019 2018 2017 2016
Summary: The objective of this research is to document existing environmental conditions surrounding the Kennady North Diamond Project. Hydrology studies include the measurement of selected lake inflow and outflow and stream profile through field surveys, and installation of data loggers to continually monitor lake levels through the open-water season. Hydrology studies will be initiated during the spri...


NTPC Bluefish Hydro Repairs
Principal Investigator: Panayi, Damian
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: The objective of this study is to describe the terrestrial and aquatic environment in the Yellowknife River between Prosperous Lake and Bluefish Lake as per the Fisheries Authorization and the Water Licence. This may include investigating vegetation, water quality, benthic invertebrate populations, and fish. The results will be used to determine the most suitable means of fish habitat compensation...


Nonacho Lake Investigations for the Taltson Expansion Project
Principal Investigator: Panayi, Damian
Licensed Year(s): 2008
Summary: Objectives of the surveys will be to document locations of snowmobile travel routes, record snow depth, ice thickness, presence of overflow, and presence of hanging ice and thickness of air pocket if present. The Deze Energy Corporation is planning to construct the Taltson Expansion Project, which would supply diamond mines with hydroelectricity from the Twin Gorges facility on the Taltson Rive...


TOTAL PAGES: 1