Principal Investigator:Harris, Katherine M. Licensed Year(s):201720162014
2013
201220112010200920082006200520042003 Summary:
The objective of this research project is to collect baseline environmental information for future environmental effects monitoring.
Surveys may include assessments of fish, fish habitat, benthic invertebrates, plankton, water and sediment quality, wetlands and geochemistry. Equipment for surveys will be limited to standard field measuring and surveying equipment, such as automated water qualit...
Principal Investigator:Wen, Marc Licensed Year(s):20132012201120102009
2008
20072006200520042003 Summary:
This research will characterize baseline and post-baseline conditions in the lakes and streams near areas of current and pending mining activity. This will be the 11th year of post-baseline data collected in the Koala Watershed and the 8th year of post-baseline data collected in the King-Cujo Watershed as a part of EKATI’s Aquatic Effects Monitoring Program. It will also be the 10th year of monito...
Principal Investigator:Evans, Marlene S. Licensed Year(s):20092008
2007
2006 Summary:
This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...
Principal Investigator:Evans, Marlene S. Licensed Year(s):20092008
2007
2006 Summary:
This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...
Principal Investigator:Mochnacz, Neil Licensed Year(s):
2006
Summary:
The Mackenzie Gas Pipeline will cross more than 600 tributaries of the Mackenzie River, ranging from small (< 1 m) vegetated swales to large rivers. All construction methods, with the exception of trenchless drilling, will disturb the bed and banks of the rivers they cross. Fish habitat use and distribution has not been studied in sufficient detail.
Fish will be captured and identified for spec...
Principal Investigator:Hamm, Sharleen Licensed Year(s):
2006
Summary:
In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...
Principal Investigator:Moore, Peter Licensed Year(s):2004
2003
Summary:
Dillon Consulting Limited has been retained to complete habitat restoration activities at the historic Salmita Mine site at Matthews Lake. The 2003 phase of this project is to conduct baseline aquatic assessments at the Matthews Lake site to identify pr...
Principal Investigator:Buckland, Laurie L Licensed Year(s):
2003
Summary:
The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...
Principal Investigator:Newyar, Chuck Licensed Year(s):
2003
Summary:
This survey is required to obtain specific environmental information to be used in support of land use permit and water licence applications for EnCana's proposed winter drilling program within the Tulita District of the Sahtu Settlement Area. Emphasis...
Principal Investigator:Monita, Darwin Licensed Year(s):
2001
Summary:
The aquatic assessment is scheduled for September and October, 2001, and will focus on three lakes in the Chevron Canada Resources 2001/2002 seismic program areas in the Ellice 3-D, Mallik 3-D and Ogruknang 3-D blocks. All lakes examined will exceed 400m in width. No field camps will be used, all garbage will be packed out, and all human waste buried. The field crew will include a senior fisheri...