Principal Investigator:Moore, Peter Licensed Year(s):2004
2003
Summary:
Dillon Consulting Limited has been retained to complete habitat restoration activities at the historic Salmita Mine site at Matthews Lake. The 2003 phase of this project is to conduct baseline aquatic assessments at the Matthews Lake site to identify pr...
Principal Investigator:Moore, Peter Licensed Year(s):
2003
Summary:
As part of the 2003 Baker Creek Environmental Monitoring Program, Dillon Consulting Limited will conduct fish habitat assessments at Baker Creek, Yellowknife. Benthic invertebrates will be sampled at each of 8 sampling sites using multi-plate artificial...
Principal Investigator:Moore, Peter Licensed Year(s):
2002
Summary:
The objective of this study is to collect detailed baseline information on several seasonal streams and ponds on BHP Billiton's Ekati Claim Block, confirm the presence or absence of various fish species in the proposed areas, and determine their value as...
Principal Investigator:Moore, Peter Licensed Year(s):
2001
Summary:
Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....
Principal Investigator:Moore, Peter Licensed Year(s):20032002
2001
200019991998 Summary:
The project will look at the effectiveness of created fish habitat within the on-site Panda Diversion Channel. Assessments will include fish use, invertebrate use, stability and function on a seasonal and yearly basis. Fish will be collected and released live using two-way box traps, seineing and electro-fishing. Invertebrates and periphyton samples will be taken using atrificial substrate sample...
Principal Investigator:Moore, Peter Licensed Year(s):2001
2000
Summary:
This program is a detailed assessment of the created/enhanced habitat at Frank Channel, based on fish use and function in comparison with habitat design targets. Habitat monitoring will require seasonal assessments within the open water period at times associated with the targeted fish's life stages (Northern Pike). During early spring, mid summer and late summer, Frank Channel habitat will be m...