Principal Investigator:Gingras, Nathalie Licensed Year(s):
2016
Summary:
The key question to be addresses is: how to improve the assessment, regulatory and associated decision-making processes in Canada to avoid negative mine legacies and build lasting net gains. The objective of this research is to identify ways to increase the likelihood of positive mine legacies, with a focus on sustainability-based environmental assessments.
This research involves semi-structure...
Principal Investigator:McGetrick, Jennifer Ann Licensed Year(s):2014
2013
Summary:
The overall objective of the research is to evaluate the use of Geographic Information Systems (GIS) as a health communication tool for consultation with stakeholders in environmental assessment of the Nico Project in the Tlicho Region of the Northwest Territories. By documenting stakeholder's evaluation of GIS in the environmental assessment, the research will help to inform best practices and pr...
Principal Investigator:Wiatzka, Gerd M Licensed Year(s):
2007
2006 Summary:
The project objectives include the collection of information and samples to characterize the environmental conditions at the sites. The types of samples to be collected include: water (8 samples), sediment (5 samples), soil/tailings/waste rock (5 samples) and designated substances (e.g., asbestos, lead paint, PCBs, hydrocarbons).
The work involves manual sampling and measurement with minimal d...
Principal Investigator:Galbraith, Lindsay Licensed Year(s):
2004
Summary:
This research is concerned with increasingly fractious relations between mining firms and local communities in Canada's hinterlands, and the systems of governance that aim to mediate these relations. More specifically, this research seeks to understand t...
Principal Investigator:d'Entremont, Marc Licensed Year(s):
2003
Summary:
In preparation of DIAND's detailed Arsenic Trioxide Management Project Description, an assessment of the current environmental conditions at and around the Giant Mine site and an assessment of the potential environmental impacts associated with implement...
Principal Investigator:Teichreb, Chris Licensed Year(s):2013201220112010200920082007200620052004
2003
Summary:
This work will assess the effects that mining may have on the aquatic environment of lakes within the Ekati claimblock as part of BHP Billiton's Aquatic Effects Monitoring Program. Data to be collected includes water quality, sediment quality, physical l...
Principal Investigator:Thomas, Craig J Licensed Year(s):
2000
Summary:
This is a preliminary fisheries study to confirm 1989 baseline studies and to assist in impact assessment for Abandonment and Restoration (A & R) Plan for site closure. The researchers will conduct habitat assessments along drainages of Steeves Lake and Indin River (i.e. fish habitat mapping, assessment of habitat potential, 'spot check' confirmation of fish communities, the collection of instant...
Principal Investigator:Digel, Mark Licensed Year(s):
1996
1995 Summary:
Methods of data collection will include water quality and bottom sampling in Lac de Gras and Lac du Sauvage; automatic and manual water level recordings; bathometric work; automatic weather stations and the monitoring of air-borne particles and visibility; continuation of baseline studies of soils and terrain, and vegetation; fish population, habitat, health, and spawning habits studies; baseline ...
Principal Investigator:Witteman, John Licensed Year(s):
1996
1995 Summary:
As part of overall reclamation goals of BHP, the 1996 season will focus on three components. Vegetation response will be assessed in August using the point-frame method. Within the legume, indigenous seed and shrub cutting plots, plant density will be recorded. Soil samples in replicates of three will be collected from each treatment to analyze physical and chemical characteristics. Secondly, ...