214 record(s) found with the tag "soil" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2004 Terrestrial Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...


2004 Terrestrial Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...


Post Construction Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Kustan, Ed
Licensed Year(s): 2004
Summary: The purpose of this monitoring program is to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of eight permanent sampling transects were established along the pipeline right-of-way; two in...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


ChevronTexaco 2005 Drilling Operations - Project Description Data Collection
Principal Investigator: Pyc, Cynthia
Licensed Year(s): 2004
Summary: Soil samples will be taken from four potential sump sites for the 2005 drilling program. Soil samples will provide information on active layer depth, soil composite, salinity levels, permeability and moisture content to determine sump site suitability. I...


Active Layer Monitoring Network in the Mackenzie Valley
Principal Investigator: Nixon, Mark
Licensed Year(s): 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990
Summary: This ongoing survey examines permafrost so as to better understand how the active layer varies locally and regionally and how it will respond to environmental change, including but not restricted to climate change. The research team will survey from For...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


2003 Norman Wells Summer Field Geotechnical Investigation Program - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2003
Summary: This study will gather information to assess the soil and ground conditions at representative frost heave study sites within the municipal boundaries of the Town of Norman Wells. The information will be used in assessing the feasibility of a pipeline in...


2003 Fort Simpson Summer Field Geotechnical Investigation Program - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2003
Summary: The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...


Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


TOTAL PAGES: 22