43 record(s) found for principal investigator "Povey, Andrew" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Summer and Fall Aquatic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. All of the aquatic studies will be conducted by three- or four-person crews supported by helicopter, or if possible, by boat. Each crew will include a local assistant. T...


2005 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: During this study, activities conducted will include vegetation mapping, rare plant surveys, rare plant mitigation planning, timber cruising, and landform, soil and permafrost investigations. Vegetation mapping surveys will consist of visual observations from a helicopter to confirm vegetation types for mapping. These surveys will be conducted in conjuction with rare plant surveys. Sampling equi...


2005 Route and Site Reconnaissance in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...


2005 Traditional Knowledge Studies in the Tulita District of the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005
Summary: The Traditional Knowledge (TK) Study is being conducted in a manner that will: provide the specific TK information needs of the MGP; facilitate meaningful participation by communities in the environmental assessment process; and, ensure compliance with all regulatory requirements for the use of TK in the environmental assessment. The key components of the TK Study include: collecting existing know...


2005 Traditional Knowledge Studies in Fort Providence
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005
Summary: The key objectives of the traditional knowledge study include collecting existing knowledge, gathering new knowledge and producing a report in a manner that will: provide the specific Traditional Knowledge (TK) information needs of the Mackenzie Gas Project (MGP); facilitate participation by communities in the environmental assessment process; and, ensure compliance with all regulatory requirement...


2005 Terrestrial Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies in the Inuvialuit Settlement Region (ISR) will include vegetation classification, rare plant surveys, and landform, soil and permafrost investigations. The studies will be conducted by three- or four-person crews supported by helicopter and based in Inuvik. A local assistant will be hired as part of each survey team. Air calls from a helicopter will be used to map ...


2005 Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...


2005 Route and Site Reconnaissance in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...


2005 Terrestrial Studies in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies include vegetation mapping, rare plant surveys, rare plant mitigation planning, timber cruising, and landform, soil and permafrost investigations. All of the studies will be conducted by three- or four-person crews supported by helicopter. A local assistant will be included as part of each terrestrial survey team to assist in observing and recording data taken at surve...


2005 Summer and Fall Aquatic Surveys in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: As part of the Mackenzie Valley Gas Project, baseline aquatic studies in the Gwich’in Settlement Area (GSA) will continue in 2005. The work will include additional investigations into fish, hydrology and water quality in rivers and lakes previously visited, as well as summer and fall aquatics studies of waterbodies near the infrastructure sites, access roads, and borrow pits. All of the aquati...


TOTAL PAGES: 5