Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
The key objectives of the traditional knowledge study include collecting existing knowledge, gathering new knowledge and producing a report in a manner that will: provide the specific Traditional Knowledge (TK) information needs of the Mackenzie Gas Project (MGP); facilitate participation by communities in the environmental assessment process; and, ensure compliance with all regulatory requirement...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is the initiation of traditional knowledge (TK) studies in the Kakisa area, discussions for which were initiated in 2003 as part of the baseline studies and assessment for the Mackenzie Gas Project. The study will involve gathering and reviewing documented and new knowledge related to climate, soil, water, vegetation, wildlife, birds, fish, historical/cultural/spiritual sites, human ...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of traditional knowledge (TK) studies in the Fort Simpson area, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. In 2004, Nogha Geomatics was a subcontractor to the MGP and local researchers were hired to undertake study tasks. Since December 2004, project management in Fort Simpson has shifted to the Liidli...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Gwich'in Settlement Area (GSA), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Gwich'in Social and Cultural Institute (GSCI) will conduct the study in the GSA as a subcontractor to the Mackenzie Project Environment Group. The study will proceed under the gui...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Inuvialuit Settlement Region (ISR), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Community Corporations in each of Aklavik, Inuvik, and Tuktoyaktuk will be a sub-contractor to the MGP and be responsible for collecting and documenting TK during the project. ...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
Summary:
The primary focus of the socio-economic study is to identify, collect and verify socio-economic baseline information (e.g., related to land and resource use, regional and political economy, demography, community infrastructure, education facilities, heal...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to reduce helicopter time....
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Deh Cho Region; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations for poten...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Inuvialuit Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon pl...