21 dossier(s) trouvé(s) portant l’étiquette "soil" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Great Slave Lake Area Mines: 2013 Sampling Program
chercheur principal: Wiatzka, Gerd M
Année(s) de permis: 2013 2012 2011 2010
Résumé: The objective of the 2013 Great Slave Lake Mines Sampling Program is to assist Aboriginal And Northern Development Canada-Contaminants And Remediation Directorate (AANDC-CARD) with its ongoing work to clean up abandoned mine sites across the Northwest Territories. The program aims to collect additional environmental data which will be used to confirm current site conditions and to assist with fina...


Phase III ESA - Fort Simpson RCMP Detachment
chercheur principal: Schulz, Eva
Année(s) de permis: 2013
Résumé: The main objective of the Phase III Environmental Site Assessment is to delineate the hydrocarbon contamination at the site resulting from an overflow of fuel at a vent pipe of an above ground storage tank. Test holes will be excavated with a backhoe around the former spill area in order to collect soil samples. Each sample will be submitted to a Canadian Association for Laboratory Accreditatio...


PWGSC Gordon Lake Environmental Site Assessments
chercheur principal: Nyman, Jeff
Année(s) de permis: 2013
Résumé: The objective of this program is to determine the environmental and physical conditions at nine sites on Gordon Lake. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials. In addition, samples of biota (including vegetation, fish, benthic invertebrates) m...


Remediation of the Abandoned Panarctic Satellite F-68 Wellsite at Satellite Bay, Prince Patrick Island, Northwest Territories
chercheur principal: Krizan, Julia
Année(s) de permis: 2019 2018 2017 2016 2015 2013 2011 2010
Résumé: Evidence of contaminants was found in soil, groundwater and surface water at the site during investigations in 2008, 2010 and 2011. The objective of the project is to remediate the abandoned wellsite by containing and stabilizing contaminated materials in an on-site landfill, and remove debris and solid waste from the site. Talisman is proposing a two-year approach to complete the Project. Year...


Phase I/II/III ESAs and Risk Assessment
chercheur principal: Hamilton, Melissa M
Année(s) de permis: 2013
Résumé: The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...


Radiological Characterization & Delineation Study - Historical Waste Contaminated Great Bear River Sites
chercheur principal: Ceschan, Robert
Année(s) de permis: 2013
Résumé: The assessment is designed to delineate the horizontal and vertical extent of uranium contaminated soil at sites located along the Great Bear River portion of the northern transportation route (NTR). The soil quality and quantity information gathered during this assessment is required to assist in the development of future remediation plans for this segment of the NTR. The proposed tasks are as...


Supplemental Environmental Site Assessments along the Canol Trail, NT
chercheur principal: Livingstone, Steve
Année(s) de permis: 2013 2012 2010
Résumé: The purpose of the Supplemental Environmental Site Assessments is to further determine the current environmental and physical conditions at several petroleum hydrocarbon spill sites along the Canol Trail, and address the gaps identified from the 2012 sampling program. Key findings from these select sites will be synthesized to identify the scope and nature of the spills, potential trends regarding...


EBA, Five Mine Sites ESA Update and Remedial Action Plan
chercheur principal: Farrell, Rory
Année(s) de permis: 2012
Résumé: The objective of this research is to take specific samples for the completion of a remedial action plan and risk assessment for the Five Mine Sites. The field component of the project will be conducted over a two day period. Limited soil and mine tailing samples from the most contaminated areas of the site will be taken. These areas were previously identified in past environmental site asses...


Phase II Environmental Assessments of six sites in the Northwest Territories
chercheur principal: Winch, Susan
Année(s) de permis: 2012
Résumé: The objective of this research project is to conduct Phase II Environmental Site Assessments (ESAs) at six locations located within the Northwest Territories (NT). The purpose of field investigations at Caribou Point, Crestaurum Mine, Sun-Rose Claim Group, Thompson-Lundmark Mine, Wrigley Point, and Dome Lake is to determine the current environmental and physical conditions at each site and to red...


Great Bear RIver Summer of 2012 Site Assessments
chercheur principal: Geddes, Robert B
Année(s) de permis: 2012 2011
Résumé: The assessment is designed to delineate the horizontal and vertical extent of uranium contaminated soil at sites located along the Great Bear River portion of the Northwest Transportation Route (NTR). The soil quality and quantity information gathered during this assessment is required to assist in the development of future remediation plans for this segment of the NTR. The proposed tasks are a...


TOTAL PAGES: 3