Principal Investigator:Graburn, Larry Licensed Year(s):
2006
2005 Summary:
The objective of this project is to test the thermal properties of straw bales and reflective surfaces for use on permafrost slopes along a potential pipeline route in the Mackenzie Valley. These materials might be used in conjunction with or as alternatives to wood chips to protect the exposed slopes from surface erosion and reduce the rate of thawing. In mid-February 2006 a bulldozer and brush c...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
The general objective of the program is to obtain information with respect to subsurface conditions at the site by drilling up to fifty boreholes to depths ranging from sixteen to twenty metres. The specific objectives of the program are to characterize...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Aerial reconnai...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. At this time, a...