Regions: Sahtu Settlement Area
Tags: physical sciences, ground temperature, land use planning, geotechnical survey, pipeline corridor, spring breakup, snow, watercourse crossing, ice conditions, erosion, waterflow monitoring, aerial survey, Sahtu, ice damage
Principal Investigator: | Graburn, Larry (26) |
Licence Number: | 13592 |
Organization: | ColtKBR |
Licensed Year(s): |
2005
2004
|
Issued: | Apr 30, 2004 |
Project Team: | Hydrologic |
Objective(s): This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The objective of this program is to gather information during the late winter and spring break-up periods that will assist in the engineering design of watercourse crossings for the Mackenzie Gas Project. The program will include the following studies: an assessment of the effects of ice conditions for a distance of 2 km upstream and downstream of the proposed pipeline centreline; an assessment of the effects of ice on all banks and channels; observation of the distribution and winter flow volumes within the channels; determination of the amount of snow cover in the immediate vicinity of the proposed crossing area; and determination of any evidence of water spring activity within the banks and on the adjacent valley slopes. The information obtained will be used to assess the feasibility of a pipeline in the Mackenzie Valley and for preparing subsequent regulatory applications.