Stream Crossing Assessment of Select Watercourses along the Inuvik to Tuktoyaktuk Highway Alignment and Rare Plant Survey of Select Borrow Sources
Principal Investigator: Stevens, Jim
Licensed Year(s): 2013
Summary: The purpose of this study is to complete a stream crossing assessment and rare plant survey. STREAM CROSSING ASSESSMENT At each watercourse crossing site (n=12), a fish habitat assessment will be conducted from 300 m downstream to 100m upstream. Watercourses will be accessed via helicopter. The following data will be collected at each watercourse crossings site: • Six transects will be estab...


Fish Habitat Survey and Bathymetry Survey for the South Parsons Lake Gas Supply Project, NWT
Principal Investigator: Krizan, Julia
Licensed Year(s): 2012
Summary: A Fish Habitat Survey and Bathymetry Survey are required for the proposed South Parsons Lake Gas Supply Project. The objective of the surveys is to gather baseline data regarding watercourse crossings and lakes in support of documents submitted for regulatory approval, to fulfill Fisheries and Oceans Canada (DFO) requirements and to meet Transport Canada’s review of navigable waters. IMG-Golde...


Assessment of Fisheries Potential of the Tuktoyaktuk to Source 177 All-Weather Road Impact Area
Principal Investigator: Krizan, Julia
Licensed Year(s): 2009
Summary: The objectives of this project are to characterize the habitats and shorelines of the streams that would be crossed by the Tuktoyaktuk to Source 177 all-weather road. The impact area will be recorded and referenced with Global Positioning System (GPS) locations. The information will be transferred to a Geographic Information System (GIS) to complete a habitat map for the area. The Hamlet of T...


Canadian Zinc - Prairie Creek Winter Access Road Fisheries Studies
Principal Investigator: Thomas, Craig J
Licensed Year(s): 2008 2005
Summary: Objectives of this research will be to confirm the presence or absence of fish habitat at stream crossings associated with the Prairie Creek Winter Access Road alignment and if present document fish habitat characteristics (physical). The information will support documentation requirements for the Department of Fisheries and Oceans relating to the Fisheries Act and the potential need for a Fisheri...


2006 Great Bear River Seismic Test Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006
Summary: The objective of the program is to collect information regarding the surficial geology of the Great Bear River at the location of the proposed pipeline watercourse crossing. This information will be used to determine the depth to bedrock as part of the information for a river crossing design, and for use in the design of a proposed horizontal directional drill (HDD) crossing at this location. S...


Fisheries Survey of Hill Creek (located on Highway 3)
Principal Investigator: Dahl-Fequet, Monica L
Licensed Year(s): 2005
Summary: The objective of this project is to collect biological and hydrological information on Hill Creek. It is unknown as to whether or not the culvert at the Hill Creek highway crossing is large enough to allow for the spring migration of spawning fish. The researchers will collect fisheries and habitat information on Hill Creek. This data will include fish presence/absence, lifestage and species com...


2005 Winter and Spring Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans. The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...


2004 Summer and Fall Aquatic Surveys in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...


2004 Spring Break-up Watercourse Investigation Program - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...


2004 Spring Break-up Watercourse Investigation Program - Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...