9 record(s) found for principal investigator "Hawkins, Jim" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006-2007 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be performed by...


2006 -2007 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008. Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...


2006 - 2007 Biophysical and Reconnaissance Studies in the Gwich’in Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be by helicopte...


2006 – 2007 Biophysical and Reconnaissance Studies in the Deh Cho Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes. Route and site reconnaissance will be carried out ...


2007 Winter Field Geophysical Investigation Program in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: The objective of the program is to map areas along the right-of-way where the ground is unfrozen (taliks) and to locate ice wedges and larger, deeper areas of massive ice, in the Inuvialuit Settlement Region. Shallow geophysical surveys will provide information on subsurface conditions. ARGO tracked vehicles will tow geophysical instruments (EM31, Ohm Mapper, or GEM-2) behind them. A ground-penetr...


2007 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: The objective of the field program is to conduct geotechnical investigations on soil and ground conditions at the site of the proposed Inuvik Area Facility (IAF) and along the route of the all-weather road connecting the IAF to the Dempster Highway, in order to design foundations and roads, and for subsequent applications. In order to complete the fieldwork before the spring thaw, an access roa...


2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - K'asho Got'ine District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...


2006 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006 2006
Summary: A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 65 people. Secondary access to the investigation s...


2006 Great Bear River Seismic Test Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006
Summary: The objective of the program is to collect information regarding the surficial geology of the Great Bear River at the location of the proposed pipeline watercourse crossing. This information will be used to determine the depth to bedrock as part of the information for a river crossing design, and for use in the design of a proposed horizontal directional drill (HDD) crossing at this location. S...


TOTAL PAGES: 1