3 record(s) found for principal investigator "Hawkins, Jim" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2007 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: The objective of the field program is to conduct geotechnical investigations on soil and ground conditions at the site of the proposed Inuvik Area Facility (IAF) and along the route of the all-weather road connecting the IAF to the Dempster Highway, in order to design foundations and roads, and for subsequent applications. In order to complete the fieldwork before the spring thaw, an access roa...


2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - K'asho Got'ine District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...


2006 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006 2006
Summary: A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 65 people. Secondary access to the investigation s...


TOTAL PAGES: 1