37 dossier(s) trouvé(s) portant l’étiquette "watercourse crossing" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

2002 Aquatic Studies in the Inuvialuit Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


2002 Aquatic Studies in the Gwich'in Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


2002 Aquatic Studies: Sahtu Settlement Area
chercheur principal: Povey, Andrew
Année(s) de permis: 2005 2004 2003 2002
Résumé: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...


2001 Fish and Fish Habitat and Water Quality Surveys: Sahtu Settlement Area
chercheur principal: Metikosh, Serge
Année(s) de permis: 2001
Résumé: The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...


2001 Fish and Fish Habitat and Water Quality Surveys: Gwich'in Settlement Area
chercheur principal: Metikosh, Serge
Année(s) de permis: 2001
Résumé: The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...


Fish Habitat Compensation Monitoring Program - Highway #3, Stagg River
chercheur principal: Moore, Peter
Année(s) de permis: 2001 2000
Résumé: This program is a detailed assessment of the created/enhanced habitat at Frank Channel, based on fish use and function in comparison with habitat design targets. Habitat monitoring will require seasonal assessments within the open water period at times associated with the targeted fish's life stages (Northern Pike). During early spring, mid summer and late summer, Frank Channel habitat will be m...


Highway #3 Reconstruction, Preferred Alignment Fisheries Habitat Assessments
chercheur principal: Thomas, Craig J
Année(s) de permis: 1998
Résumé: This study is to identify existing habitat characteristics of the potential and existing stream and pond crossings of the Highway #3 reconstruction project. Field studies will involve the identification of fish habitat characteristics, the potential identification of present fish species in those systems that suggest fish habitat is present by using seine netting techniques. Background data search...


Wildlife and Fisheries Habitat Survey at Ranger Oil's Exploratory Drilling Project near Tulita (Fort Norman).
chercheur principal: Melton, Derek
Année(s) de permis: 1997
Résumé: Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...


Fish Habitat Study in Water Course from Bluefish Hydro Dam to Bluefish Trailrace
chercheur principal: Jacobson, Toni Lynne
Année(s) de permis: 1996
Résumé: Transportation to Bluefish Hydro Electric Plant is by boat from the Miramar Con Mine Dock at Prosperous Lake. Two one day field trips to the Plant are scheduled during the collection period. Equipment to be utilized include gill or seine nets, Gee traps, backpack electrofishing unit, water flow meter, water sample bottles, canoe and outboard motor. Sample species include whitefish, lake trout, ...


Licence #2343
chercheur principal: Bouckhout, Leo W.
Année(s) de permis: 1978
Résumé: (1) To survey native grasses, legumes and shrubs and evaluate their usefulness for revegetating disturbed areas. (2) To conduct fish counts, collect water samples for chemical data determination and prepare descriptions of all water crossings....


TOTAL PAGES: 4