Principal Investigator:Melton, Derek Licensed Year(s):
2002
2000 Summary:
The objective of the study is to assess environmental conditions at sites previously developed within the project area, as well as at new development sites proposed for 2002/2003. Information from these surveys will form part of an environmental assessme...
Principal Investigator:Melton, Derek Licensed Year(s):
1999
Summary:
The overall goal of this project is to conduct preliminary baseline studies at Paramount Resources proposed gas well sites in the Fort Liard area. The wildlife program will begin with of a literature review to identify previously identified wildlife populations in the area. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies in th...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the proposed project area has been initiated. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife obser...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
Golder Associates was contracted on behalf of Grey Wolf Exploration to conduct preliminary baseline studies at Grey Wolf's proposed well sites. The objective of this study is to determine the presence or absence of fish and wildlife in the vicinity of the proposed project site. A literature search for registered archaeological sites within the proposed site is also planned. Golder Associates was c...
Principal Investigator:Melton, Derek Licensed Year(s):
1997
Summary:
Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...