Principal Investigator:Andrews, Thomas D Licensed Year(s):
2013
Summary:
The objective of this research project is to document the construction of a mooseskin boat.
This will be done through participant observation.
This is a community-initiated project, involving numerous Tulita residents, including elders and youth.
The research team will be preparing a photographic publication for use in Chief Albert Wright School in Tulita.
The fieldwork for this study ...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...
Principal Investigator:Bayha, Janet Licensed Year(s):
2004
20032002200120001998 Summary:
The Sahtu Settlement Harvest Study began as a 5-year project (1998-2003) in the five Sahtu Settlement communities. This Study is being continued in 2004 and 2005. Each month, in each community, a local interviewer recommended by the local Renewable Reso...
Principal Investigator:Graburn, Larry Licensed Year(s):2005
2004
Summary:
This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
Summary:
Surveys of selected streams and lakes along the proposed pipeline corridor within the Sahtu Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicinity...