Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Sahtu Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic investi...