Principal Investigator:Kustan, Ed Licensed Year(s):
2005
2004 Summary:
The purpose of this work is to add to the work that was done in 2002-2004 at the N-01 wellsite as part of an environmental assessment of the wellsite and associated facilities. This phase of the environmental assessment of the wellsite and associated facilities may include: additional vertical and horizontal delineation of environmental impacts; installation of two additional groundwater monitori...
Principal Investigator:Kokelj, Steven V Licensed Year(s):2006
2005
Summary:
Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...
Principal Investigator:Pyc, Cynthia Licensed Year(s):
2004
Summary:
Soil samples will be taken from two to three potential sump sites for the 2005 drilling program. Soil samples will provide information on active layer depth, soil composite, salinity levels, permeability and moisture content to determine sump site suitab...
Principal Investigator:Robinson, Cindy Licensed Year(s):
2004
Summary:
This fieldwork is for reclamation planning at the Tundra Mine site. An aquatic survey will be conducted to characterize the current conditions of water bodies adjacent to the Tundra Mine and downstream of the mine's two tailings ponds. A total of seven l...
Principal Investigator:Turchenek, Larry Licensed Year(s):
2004
Summary:
The overall project objective is to collect information on the Gahcho KuÚ and 'control lake' areas for use in impact assessment and environmental protection planning for a proposed mine development. AMEC Earth and Environmental (AMEC) has been retained t...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...