17 dossier(s) trouvé(s) portant l’étiquette "site remediation" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Talisman Energy Inc. Abandoned Panarctic Satellite F-68 Wellsite Contamination Delineation Program
chercheur principal: Krizan, Julia
Année(s) de permis: 2019 2018 2017 2016 2015 2013 2011 2010
Résumé: Oil and gas exploration activities took place on Prince Patrick Island in the 1970s, including the drilling of wellsite Panarctic Satellite F-68 at Satellite Bay. These activities resulted in the known abandonment of structures, debris and environmental concerns at Satellite Bay including one large garage and two small trailers; several burn pits and burnt material; a “dilapidated garage” on an a...


2007 Tuktoyaktuk Base Camp Decommissioning and Clean-Up
chercheur principal: Sampson, Jack
Année(s) de permis: 2007
Résumé: The purpose of this project at the Tuktoyaktuk Base Camp is to sample soil, surface water and groundwater in the area; sample and characterize materials in Seacans; investigate and characterize landfill waste; investigate soil impact, residual fluids in tanks, and potential historical spill areas – as well as inspect the docks and assess the condition of infrastructure. Imperial Oil intends to dec...


Taglu D-43 Well Site Surficial Clean Up and Sump Assessment; 2007 Taglu G-33 Well Site Surface Clean Up and Sump Assessment; and 2007 Debris Clean Up at Ivik J-26 Well Site
chercheur principal: Sampson, Jack
Année(s) de permis: 2007
Résumé: The purpose of this project is to conduct debris clean up and further environmental assessment of the drilling sumps at the Taglu D-43 and G-33 well sites, as a follow-up to the 2004 limited investigation to confirm sump contents are appropriately contained. Furthermore, at the G-33 site, previously reported hydrocarbon stained soil will be removed and debris will be cleaned up at the Ivik J-26 we...


Investigation of groundwater conditions and fate of fuel spills in subsurface, Wrigley, NWT
chercheur principal: Van Stempvoort, Dale R.
Année(s) de permis: 2005
Résumé: The objectives of this study are to 1) address information gaps with respect to groundwater quality and quantity along the proposed pipeline corridor; 2)gather groundwater information along the corridor between Fort Simpson and Great Bear Lake; 3) examine remediation processes for, and results of, petroleum spills in the north; and 4) help the Department of Transportation investigate potential gro...


Pointed Mountain, NWT, BP Canada Energy Company
chercheur principal: Johnson, Pascale
Année(s) de permis: 2006 2005 2004 2003 2002
Résumé: The Pointed Mountain Gas Plant, six associated wellsites, and the airstrip are being assessed during the decommissioning process. The site was initially constructed in 1966. The plant has been shut down since September 2001. The Pointed Mountain field has had soil, groundwater, and surface water assessed since 1990. Previous environmental work and public consultation at this site have identifi...


Environmental Studies Research Funds Regional Sump Study Project
chercheur principal: Jenkins, Robert
Année(s) de permis: 2004
Résumé: This study is being led by the Environmental Studies Research Funds Technical Advisory Group with members representing government, industry, and Inuvialuit. This research will help address growing concerns over the use of sumps as a disposal option for d...


2004 Summer Reconnaissance Program in the Deh Cho Region
chercheur principal: Graburn, Larry
Année(s) de permis: 2004 2003
Résumé: The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...


Chevron North Langley Sump Revegetation Project
chercheur principal: Soppet, Dayle
Année(s) de permis: 2004
Résumé: Chevron Canada Resources, representing its joint venture partners, conducted a drilling program on Langley Island during winter 2003. Restoration of the salvaged top layer of material on the sump is complete, and the next stage is revegetation of the sum...


Modified Phase II-III Environmental Site Assessment F-36 Wellsite
chercheur principal: Miller, Samantha
Année(s) de permis: 2003 2002
Résumé: The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...


2003 Terrestrial Studies in the Deh Cho Region
chercheur principal: Povey, Andrew
Année(s) de permis: 2004 2003 2002
Résumé: These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants and uncommon plant communities, and to co...


TOTAL PAGES: 2