Principal Investigator:Haas, Claudia A Licensed Year(s):
2012
2011 Summary:
This project is to fill gaps in ecological information on a Candidate Protected Area while it makes its way through the NWT Protected Areas Strategy (PAS) process. This information will be used by the working group to make recommendations on final boundary and management planning for the area.
The study will be done at the same time as a study on mercury in fish being conducted by the Dehcho F...
Principal Investigator:Moore, Kristin M Licensed Year(s):202420232022202120192018201720162015201420132012
2011
201020092008200720052004200320022001 Summary:
To revisit fixed sample stations over the course of a year in an effort to determine any seasonal variation that may exist and confirm impact predictions. The study will encompass the following water based parameters: water quality, zooplankton & phytoplankton biomass and taxonomy, benthic invertebrate analysis and sediment chemistry. This program also includes dust monitoring and fish health.
...
Principal Investigator:Martin, Genevieve Licensed Year(s):
2007
2006 Summary:
This will be the second year of baseline environmental data collection, collected by Gartner Lee Ltd. on behalf of Anaconda Gold Corp. for the Damoti Gold Project. These studies will build on existing environmental data that was collected previously by various sources. The following tasks are associated with this study: fish and fish habitat assessments, hydrologic assessments and water quality as...
Principal Investigator:Dube, Monique G Licensed Year(s):
2006
Summary:
The objectives of this research are three-fold: 1) to determine the natural variability of benthic invertebrate and fish communities at sites free of human impact; 2) to determine any changes in these due to mining activity relevant to regional variability; and 3) to establish dose response relationships and critical thresholds for stressors including mine effluent, ammonia, a hydrocarbon indicato...
Principal Investigator:Evans, Marlene S. Licensed Year(s):200920082007
2006
Summary:
While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relatively comprehensive in describing the major physical-chemical features of the aquatic environment, they are lacking in the descriptions of the biological features of these environments, and as a consequence, their s...
Principal Investigator:Hamm, Sharleen Licensed Year(s):
2006
Summary:
In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Uren, Shane Licensed Year(s):
2004
Summary:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
Principal Investigator:Buckland, Laurie L Licensed Year(s):
2003
Summary:
The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...