126 record(s) found with the tag "habitat" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Beaufort Shelf Seabed Mapping Project
Principal Investigator: Blasco, Steve M
Licensed Year(s): 2009 2008 2007 2006 2005 2004 2003
Summary: The objective of the seabed mapping program is to conduct a regional survey of the Beaufort shelf over the next two years. Ice scouring processes, benthic habitats, abandoned artificial islands, pingo-like features, gas seeps, seafloor foundation conditions, subsea permafrost and coastal stability will be investigated. The Coast Guard vessel CCGS Nahidik will be used as the research platform...


Biological Studies of Waters along the Proposed Mackenzie Gas Pipeline Route - Inuvialuit Settlement Region
Principal Investigator: Evans, Marlene S.
Licensed Year(s): 2009 2008 2007 2006
Summary: This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...


Biogeochemistry of Lakes in the Mackenzie Delta
Principal Investigator: Lesack, Lance
Licensed Year(s): 2017 2016 2015 2014 2010 2009 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993
Summary: Specific activities for this field season include the following: (1) Resolution of the sources and fates of dissolved organic carbon (DOC) in aquatic food webs of the Mackenzie Delta (year 3 of PhD thesis project of S. Tank). This information is needed to ultimately understand the relative role of bacterial (fueled by DOC) versus photosynthetic organisms and their importance in ultimately sup...


2007 Field Monitoring - Matthews Lake and Area Fish Habitat Restoration and Enhancement Project
Principal Investigator: Van Humbeck, Joe
Licensed Year(s): 2007
Summary: The objective of the 2007 portion of the project is to monitor control sites and treatment sites, and collect information on the habitat utilization. Data collected will be used to evaluate the continued success and effectiveness of the habitat construction and enhancement. Field crews will fly to Matthews Lake, landing either on the runway or the lake. The Treeline Lodge, where the research te...


Biological Studies of Waters Along the Proposed Mackenzie Gas Pipeline Route - Gwich'in Settlement Region
Principal Investigator: Evans, Marlene S.
Licensed Year(s): 2009 2008 2007 2006
Summary: This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...


2006 -2007 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008. Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...


Dall’s Sheep, Grizzly Bears and Wolves interactions in the Gwich’in Settlement Area: Traditional Knowledge and Climate Monitoring
Principal Investigator: Lambert Koizumi, Catherine
Licensed Year(s): 2010 2008 2006
Summary: The proposed project aims to: 1) update and expand important baseline information on Dall’s sheep, grizzly bears, and wolves, which will contribute to the revision of grizzly and Dall's sheep management plan; 2) understand the interactions between those species; 3) evaluate the effect of habitat features and climate on those interactions; and 4) document traditional knowledge about Dall's sheep, g...


Distribution and Habitat Use of Sensitive Fish Species along the Mackenzie River Valley
Principal Investigator: Mochnacz, Neil
Licensed Year(s): 2006
Summary: The Mackenzie Gas Pipeline will cross more than 600 tributaries of the Mackenzie River, ranging from small (< 1 m) vegetated swales to large rivers. All construction methods, with the exception of trenchless drilling, will disturb the bed and banks of the rivers they cross. Fish habitat use and distribution has not been studied in sufficient detail. Fish will be captured and identified for spec...


WO Diamond Project
Principal Investigator: Hamm, Sharleen
Licensed Year(s): 2006
Summary: In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...


Gahcho Kue Project Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: Baseline studies in the Gahcho Kue (Kennady Lake) area, in conjunction with the DeBeers Gahcho Kue Diamond Mine Project, have been ongoing since 1998. AMEC Earth and Environmental has been contracted by DeBeers to conduct these studies. This year, independent of the Mackenzie Valley Environmental Impact Review Board's regulatory requirements*, two studies are planned to be conducted in the project...


TOTAL PAGES: 13