Principal Investigator:Blasco, Steve M Licensed Year(s):20092008
2007
2006200520042003 Summary:
The objective of the seabed mapping program is to conduct a regional survey of the Beaufort shelf over the next two years. Ice scouring processes, benthic habitats, abandoned artificial islands, pingo-like features, gas seeps, seafloor foundation conditions, subsea permafrost and coastal stability will be investigated.
The Coast Guard vessel CCGS Nahidik will be used as the research platform...
Principal Investigator:Evans, Marlene S. Licensed Year(s):20092008
2007
2006 Summary:
This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...
Principal Investigator:Lesack, Lance Licensed Year(s):201720162015201420102009
2007
20062005200420032002200120001999199819971996199519941993 Summary:
Specific activities for this field season include the following:
(1) Resolution of the sources and fates of dissolved organic carbon (DOC) in aquatic food webs of the Mackenzie Delta (year 3 of PhD thesis project of S. Tank). This information is needed to ultimately understand the relative role of bacterial (fueled by DOC) versus photosynthetic organisms and their importance in ultimately sup...
Principal Investigator:Van Humbeck, Joe Licensed Year(s):
2007
Summary:
The objective of the 2007 portion of the project is to monitor control sites and treatment sites, and collect information on the habitat utilization. Data collected will be used to evaluate the continued success and effectiveness of the habitat construction and enhancement.
Field crews will fly to Matthews Lake, landing either on the runway or the lake. The Treeline Lodge, where the research te...
Principal Investigator:Evans, Marlene S. Licensed Year(s):20092008
2007
2006 Summary:
This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008.
Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...
Principal Investigator:Lambert Koizumi, Catherine Licensed Year(s):20102008
2006
Summary:
The proposed project aims to: 1) update and expand important baseline information on Dall’s sheep, grizzly bears, and wolves, which will contribute to the revision of grizzly and Dall's sheep management plan; 2) understand the interactions between those species; 3) evaluate the effect of habitat features and climate on those interactions; and 4) document traditional knowledge about Dall's sheep, g...
Principal Investigator:Mochnacz, Neil Licensed Year(s):
2006
Summary:
The Mackenzie Gas Pipeline will cross more than 600 tributaries of the Mackenzie River, ranging from small (< 1 m) vegetated swales to large rivers. All construction methods, with the exception of trenchless drilling, will disturb the bed and banks of the rivers they cross. Fish habitat use and distribution has not been studied in sufficient detail.
Fish will be captured and identified for spec...
Principal Investigator:Hamm, Sharleen Licensed Year(s):
2006
Summary:
In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...
Principal Investigator:Bekhuys, Tim Licensed Year(s):
2006
2005 Summary:
Baseline studies in the Gahcho Kue (Kennady Lake) area, in conjunction with the DeBeers Gahcho Kue Diamond Mine Project, have been ongoing since 1998. AMEC Earth and Environmental has been contracted by DeBeers to conduct these studies. This year, independent of the Mackenzie Valley Environmental Impact Review Board's regulatory requirements*, two studies are planned to be conducted in the project...