Principal Investigator:Panayi, Damian Licensed Year(s):20182017201620152014
2013
201220112010 Summary:
The objective of this study is to describe the terrestrial and aquatic environment in the Yellowknife River between Prosperous Lake and Bluefish Lake as per the Fisheries Authorization and the Water Licence. This may include investigating vegetation, water quality, benthic invertebrate populations, and fish. The results will be used to determine the most suitable means of fish habitat compensation...
Principal Investigator:Tonn, William Licensed Year(s):2014
2013
2012201120102009 Summary:
The objectives of this research project are: to study the freshwater ecology, hydrology, and hydraulics of small lakes and streams in the Lac de Gras basin before habitat modification; to monitor the changes in ecosystem productive capacity resulting from habitat modifications designed to increase habitat connectivity and fish passage; and to assess the effectiveness of such habitat modifications ...
Principal Investigator:Wen, Marc Licensed Year(s):20132012201120102009
2008
20072006200520042003 Summary:
This research will characterize baseline and post-baseline conditions in the lakes and streams near areas of current and pending mining activity. This will be the 11th year of post-baseline data collected in the Koala Watershed and the 8th year of post-baseline data collected in the King-Cujo Watershed as a part of EKATI’s Aquatic Effects Monitoring Program. It will also be the 10th year of monito...
Principal Investigator:Morrison, Scott Licensed Year(s):
2007
200620052004 Summary:
Consistent with the DFO authorization, the major objectives of this study are to:
1) to provide annual documentation of shoal habitat use by Lake Trout in the vicinity of the mine site. FA Clause 8.1.3
2) to ground truth hydroacustic equipment by capturing fish to identify species, collect life history data, tag, and then release
As stated in the Authorization for Works or Undertakings Affec...
Principal Investigator:Hamm, Sharleen Licensed Year(s):
2006
Summary:
In view of Peregrine Diamonds Ltd.’s move to advance the DO-27 kimberlite pipe of the WO Diamond Project to the pre-feasibility assessment phase, this project is proposed to collect baseline data that would contribute to an Environmental Assessment in subsequent years. Gartner Lee Ltd has been contracted to undertake field sampling, which will consist of examining surface water quality; hydrology;...
Principal Investigator:Jalkotzy, Peter Licensed Year(s):
2001
2000 Summary:
Selection of lakes for this program was based on: size (diameter/depth); fish over-wintering potential; connectivity with other waterbodies; and the likelihood of intensive (3D) seismic activity occurring within the lakes during the winter of 2001-02. A total of 6 lakes have been identified for inclusion in the survey. Three alternate lakes have also been identified in the event that those selec...