30 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Phase II Environmental Site Assessment of ten (10) site along the Canol Trail (NM050)
Principal Investigator: Hadley, Katherine
Licensed Year(s): 2009
Summary: The purpose of the Phase II ESAs is to further determine the current environmental and physical conditions at 10 sites along the Canol Trail and to reduce data gaps and allow development of the appropriate remediation strategies and costs. This will include the identification and quantification of environmental impacts to soil, sediment, surface water and groundwater, as well as the identificatio...


Contaminated Sites Field Sampling Follow-up - Great Bear Lake Sites
Principal Investigator: Wiatzka, Gerd M
Licensed Year(s): 2009 2008 2007 2006 2005
Summary: This licence is being issued for the scientific research application # 845. SENES will be carrying out the sampling for the Contaminants and Remediation Directorate (CARD) of Indian and Northern Affairs Canada (INAC) at the abandoned Great Bear Lake mine sites in the Sahtu region. Sampling will be taken to determine remediation objectives for metal concentrations in soil. The ultimate objectiv...


2006 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2006 2006
Summary: A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 65 people. Secondary access to the investigation s...


Regional Terrain Hazards Mapping
Principal Investigator: Couture, Réjean
Licensed Year(s): 2006 2005
Summary: The goal of this project is to compile updated baseline information/knowledge on the types, regional distribution, and controls (e.g. forests fires, climate change) of landslides. The main objectives of the field reconnaissance at landslide sites are six-fold: 1) to validate previous data collected through air photo interpretation and remote sensing techniques; 2) to carry out detailed mapping at ...


2006 Traditional Knowledge Study in Fort Good Hope
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The study marks a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with the community of Fort Good Hope in 2003. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protec...


Mackenzie Valley Landslide Geotechnical Investigations
Principal Investigator: Nichol, Susan L.
Licensed Year(s): 2005
Summary: The objective is to improve knowledge about landslides in the Mackenzie Valley. The results of this study will enable better environmental impact assessments and help to reduce environmental impacts related to the construction and operation of the proposed Mackenzie Valley pipeline. As well, the results will have a broader application to a wide range of future development activities in the region....


2005 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...


2004 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...


Active Layer Monitoring Network in the Mackenzie Valley
Principal Investigator: Nixon, Mark
Licensed Year(s): 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 1990
Summary: This ongoing survey examines permafrost so as to better understand how the active layer varies locally and regionally and how it will respond to environmental change, including but not restricted to climate change. The research team will survey from For...


2003 Norman Wells Summer Field Geotechnical Investigation Program - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2003
Summary: This study will gather information to assess the soil and ground conditions at representative frost heave study sites within the municipal boundaries of the Town of Norman Wells. The information will be used in assessing the feasibility of a pipeline in...


TOTAL PAGES: 3