Principal Investigator:Hayward, April Licensed Year(s):
2024
Summary:
This licence has been issued for the scientific research application No. 5823.
The purpose of the baseline program field studies is to characterize existing conditions in the project vicinity and surrounding region to support project planning, permitting, and development of a proposed lithium mine.
Air Quality
One continuous air quality monitoring station will be installed to measure ambi...
Principal Investigator:McLean, Sarah C Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4858.
The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area.
Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...
Principal Investigator:Ziervogel, Herb Licensed Year(s):
2010
Summary:
The objectives of this project are to conduct environmental site assessments at the five sites to identify the extent of various contaminations in the soil, water and sediments. A remediation action plan will be prepared for future cleanup at the sites.
The field team will use shovel and hand auger to collect limited soil and waste rock samples for lab testing. The lab testing will focus on ...
Principal Investigator:Davidson, Scott Licensed Year(s):
2009
Summary:
The Phase I Environmental Site Assessment is a "non-intrusive" assessment, means no borehole or test pit will be drilled on the site and no water or soil samples will be collected or laboratory analyses. The majority of the work focus on desktop studies, by reviewing previous drilling reports, geological investigation reports, environmental assessment reports, claim reports, information at the go...
Principal Investigator:Robb, Tonia L Licensed Year(s):
2009
Summary:
The objectives of the monitoring program are to ensure that the on-site remediation works remain effective; to ensure that site specific health risks are monitored; and to identify any long-term changes that might be indicative of failures of the remediation works.
The above objectives will be met by conducting a geotechnical inspection of the decommissioned mine, tailings and waste dump areas;...
Principal Investigator:Wright, Greg T Licensed Year(s):
2009
Summary:
The objectives of the assessment are to collect sufficient soil, sediment and surface water samples in order to characterize the site and to determine areas that require remediation. Samples of the waste rock piles will also be evaluated to determine the potential for acid rock drainage. After the completion of the field program, a risk assessment will be completed to Health Canada protocols in ...
Principal Investigator:Ziervogel, Herb Licensed Year(s):
2009
Summary:
The objective of this project is to determine the current environmental and physical condition of the site, in support of the development of a remedial action plan and remediation specifications for the site.
On Treasure Island, the field team will use shovel and hand auger to collect limited soil and waste rock samples for lab testing. The lab testing will focus on hydrocarbons and metals. Th...
Principal Investigator:Farrell, Rory Licensed Year(s):
2009
Summary:
The objectives of this project are to characterize and delineate potential contaminants of concern at the Site, determine volumes of Hazardous Materials at the Site and identify potential borrow sources for landfilling at the Site (if necessary). A remedial action plan will then be developed outlining the most environmental, and cost effective method to restore the Site to its natural condition.
...
Principal Investigator:Wiatzka, Gerd M Licensed Year(s):2007
2006
Summary:
Indian and Northern Affairs Canada (INAC) has assumed responsibility for the contaminated sites of the Indore and Beaverlodge (Hottah) Mines and is in the process of characterizing the ecological and human health and safety risks associated with the sites in order for remediation strategies to be developed.
The work involves manual sampling and measurement with minimal disturbance of site cond...