8 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

De Beers Snap Lake Mine Environmental Monitoring 2020-2024
Principal Investigator: Prather, Colleen
Licensed Year(s): 2021 2020 2019 2018 2017 2016 2015 2014 2012 2011 2010 2009 2008 2007 2006 2005 2004 2002 2001 2000 1999
Summary: This licence has been issued for the scientific research application No.4635. The objective of this research are to conduct environmental monitoring of wildlife, vegetation, air quality, hydrology, and aquatic effects in the Snap Lake study area. The research team will collect incidental observational data of wildlife near the Snap Lake Mine. Through this project the research team will coll...


2003 Aquatic Effects Monitoring Program
Principal Investigator: Teichreb, Chris
Licensed Year(s): 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003
Summary: This work will assess the effects that mining may have on the aquatic environment of lakes within the Ekati claimblock as part of BHP Billiton's Aquatic Effects Monitoring Program. Data to be collected includes water quality, sediment quality, physical l...


Diavik Diamond Mines Inc. 2002 Aquatic Effects Monitoring Program
Principal Investigator: Wytrychowski, Scott I
Licensed Year(s): 2024 2023 2022 2021 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2005 2004 2003 2002 2001
Summary: The purpose of the 2002 Aquatic Effects Monitoring Program is to initiate a long-term aquatics sampling program in order to produce a data set that will be used in trend analyses to track the overall effects of the project on the aquatic ecosystem of Lac...


Izok Project Environmental Baseline Studies
Principal Investigator: Hubert, Ben
Licensed Year(s): 2002
Summary: The purposes of these studies are to update the environmental baseline data set for the Izok Project in preparation for submitting a project proposal for developing the orebody at Izok Lake. This study focuses on a mineral deposit in Nunavut. The project...


Colomac Mine Abandonment and Restoration Plan - Fisheries Component
Principal Investigator: Thomas, Craig J
Licensed Year(s): 2000
Summary: This is a preliminary fisheries study to confirm 1989 baseline studies and to assist in impact assessment for Abandonment and Restoration (A & R) Plan for site closure. The researchers will conduct habitat assessments along drainages of Steeves Lake and Indin River (i.e. fish habitat mapping, assessment of habitat potential, 'spot check' confirmation of fish communities, the collection of instant...


Damoti Lake Gold Project Environmental/Engineering Baseline Study.
Principal Investigator: MacDonald, Gord
Licensed Year(s): 1997
Summary: Activities at the Damoti Lake Project Site will be as follows; 1) Archaeology - short site visit with field survey, 2) Terrestrial work will emphasize vegetation types and their value as wildlife habitat. Specific surveys for signs of moose, furbearers, raptors and other species, 3) Aquatic studies will emphasize habitat values in both lake and stream locations. Water quality work, 4) Hydrology w...


NWT Diamonds Project - Revegetation Research
Principal Investigator: Witteman, John
Licensed Year(s): 1996 1995
Summary: As part of overall reclamation goals of BHP, the 1996 season will focus on three components. Vegetation response will be assessed in August using the point-frame method. Within the legume, indigenous seed and shrub cutting plots, plant density will be recorded. Soil samples in replicates of three will be collected from each treatment to analyze physical and chemical characteristics. Secondly, ...


Fish Population and Habitat Assessment - Salmita Mine Site,NWT
Principal Investigator: Smith, B.Sc., Geoffrey M.
Licensed Year(s): 1987
Summary: 1. To collect fish to obtain samples of muscle and liver tissue for heavy metal analysis; 2. To sample stream and lake habitat areas to evaluate fish species composition, density and habitat use....


TOTAL PAGES: 1