25 record(s) found with the tag "wellsite" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Phase II Environmental Site Assessment at Pointed Mountain Gas Plant and Associated Facilities
Principal Investigator: Stone, Larry
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Forest Health at a Gas Well Site near Fort Liard, NWT
Principal Investigator: Enns, Katherine
Licensed Year(s): 2003
Summary: This project will assess the sulphur dioxide impacts of a natural gas well production test on vegetation in complex, steep terrain and establish a biomonitoring system for tracking changes in vegetation health in the vicinity of a natural gas well. Well...


Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


Environmental Assessment for Drilling and Access Development in the Fort Liard Area
Principal Investigator: Mears, Margaret
Licensed Year(s): 2002
Summary: Baseline studies will be conducted for the proposed wellsite, access roads and other related infrastructure. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. For the...


Preconstruction biophysical site assessment (wildlife, vegetation) of potential well locations and flow line options within the Significant Discovery Area, and post-construction vegetation and permafrost monitoring on the Cameron Hills Gathering System
Principal Investigator: Hong, Tom
Licensed Year(s): 2002
Summary: A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...


Modified Phase II Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The environmental assessment of the wellsite and the associated facilities may include 1) a walk around of the lease area to identify additional environmental issues if any; 2) a modified Phase II Assessment (including assessing the areas of the glycol,...


Environmental Assessment for the Fort Liard Area Seismic, Drilling and Development Project, Fort Liard, NT.
Principal Investigator: Antoine, Don
Licensed Year(s): 2001
Summary: Nahendeh Land and Environmental Services proposes to conduct baseline studies on behalf of Anadarko Canada Corporation, to determine the presence or absence of fish and wildlife habitat in the vicinity of the proposed project. The wildlife program will consist of a literature review, which would document any information on wildlife populations in the general project area, and identify any data ga...


Environmental Assessment for Exploratory Drilling Project
Principal Investigator: Johnstone, Robin
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide information on fish habitat and wildlife in the area of three exploratory petroleum well sites and along their respective access routes in the Fort Liard/Nahanni Butte area. Researchers will travel to the well sites and along access routes sites by helicopter with survey work carried out by air, small boat and on foot. Fish habitat assessments, wa...


Environmental Assessment for Proposed Oil and Gas Development Activities
Principal Investigator: Melton, Derek
Licensed Year(s): 1999
Summary: The overall goal of this project is to conduct preliminary baseline studies at Paramount Resources proposed gas well sites in the Fort Liard area. The wildlife program will begin with of a literature review to identify previously identified wildlife populations in the area. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies in th...