Principal Investigator:Krizan, Julia Licensed Year(s):20192018201720162015
2013
20112010 Summary:
Evidence of contaminants was found in soil, groundwater and surface water at the site during investigations in 2008, 2010 and 2011. The objective of the project is to remediate the abandoned wellsite by containing and stabilizing contaminated materials in an on-site landfill, and remove debris and solid waste from the site.
Talisman is proposing a two-year approach to complete the Project. Year...
Principal Investigator:Sampson, Jack Licensed Year(s):
2007
Summary:
The purpose of this project is to conduct debris clean up and further environmental assessment of the drilling sumps at the Taglu D-43 and G-33 well sites, as a follow-up to the 2004 limited investigation to confirm sump contents are appropriately contained. Furthermore, at the G-33 site, previously reported hydrocarbon stained soil will be removed and debris will be cleaned up at the Ivik J-26 we...
Principal Investigator:Stone, Larry Licensed Year(s):20062005
2004
20032002 Summary:
The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...