12 dossier(s) trouvé(s) portant l’étiquette "wellsite" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Remediation of the Abandoned Panarctic Satellite F-68 Wellsite at Satellite Bay, Prince Patrick Island, Northwest Territories
chercheur principal: Krizan, Julia
Année(s) de permis: 2019 2018 2017 2016 2015 2013 2011 2010
Résumé: Evidence of contaminants was found in soil, groundwater and surface water at the site during investigations in 2008, 2010 and 2011. The objective of the project is to remediate the abandoned wellsite by containing and stabilizing contaminated materials in an on-site landfill, and remove debris and solid waste from the site. Talisman is proposing a two-year approach to complete the Project. Year...


O-80 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


K-29 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


M-25 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


O-35 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


F-36 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


Supplemental Phase II Environmental Site Assessment, N-01 Wellsite
chercheur principal: Kustan, Ed
Année(s) de permis: 2005 2004
Résumé: The purpose of this work is to add to the work that was done in 2002-2004 at the N-01 wellsite as part of an environmental assessment of the wellsite and associated facilities. This phase of the environmental assessment of the wellsite and associated facilities may include: additional vertical and horizontal delineation of environmental impacts; installation of two additional groundwater monitori...


Phase II Environmental Site Assessment at Pointed Mountain Gas Plant and Associated Facilities
chercheur principal: Stone, Larry
Année(s) de permis: 2006 2005 2004 2003 2002
Résumé: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Modified Phase II Environmental Site Assessment O-35 Wellsite
chercheur principal: Miller, Samantha
Année(s) de permis: 2003
Résumé: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
chercheur principal: Miller, Samantha
Année(s) de permis: 2003
Résumé: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


TOTAL PAGES: 2