19 dossier(s) trouvé(s) portant l’étiquette "wellsite" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

Environmental Assessment for ConocoPhillips EL470
chercheur principal: Marken, Sandra L
Année(s) de permis: 2017 2016 2015 2014 2013 2012
Résumé: The objectives of this research project are: 1. To perform Initial scoping-level site assessment of Study Area to help inform the more detailed environmental assessment. The research team will use helicopter access to fly over the Study Area and assess overall environmental setting, identify likely sensitive areas, and focus on potential locations for drilling, access, staging and camps. Equipme...


Taglu D-43 Well Site Surficial Clean Up and Sump Assessment; 2007 Taglu G-33 Well Site Surface Clean Up and Sump Assessment; and 2007 Debris Clean Up at Ivik J-26 Well Site
chercheur principal: Sampson, Jack
Année(s) de permis: 2007
Résumé: The purpose of this project is to conduct debris clean up and further environmental assessment of the drilling sumps at the Taglu D-43 and G-33 well sites, as a follow-up to the 2004 limited investigation to confirm sump contents are appropriately contained. Furthermore, at the G-33 site, previously reported hydrocarbon stained soil will be removed and debris will be cleaned up at the Ivik J-26 we...


O-80 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


K-29 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


M-25 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


O-35 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


F-36 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


Supplemental Phase II Environmental Site Assessment, N-01 Wellsite
chercheur principal: Kustan, Ed
Année(s) de permis: 2005 2004
Résumé: The purpose of this work is to add to the work that was done in 2002-2004 at the N-01 wellsite as part of an environmental assessment of the wellsite and associated facilities. This phase of the environmental assessment of the wellsite and associated facilities may include: additional vertical and horizontal delineation of environmental impacts; installation of two additional groundwater monitori...


Phase II Environmental Site Assessment at Pointed Mountain Gas Plant and Associated Facilities
chercheur principal: Stone, Larry
Année(s) de permis: 2006 2005 2004 2003 2002
Résumé: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Modified Phase II Environmental Site Assessment O-35 Wellsite
chercheur principal: Miller, Samantha
Année(s) de permis: 2003
Résumé: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


TOTAL PAGES: 2