214 record(s) found with the tag "soil" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Great Slave Lake Area Mines: 2013 Sampling Program
Principal Investigator: Wiatzka, Gerd M
Licensed Year(s): 2013 2012 2011 2010
Summary: The objective of the 2013 Great Slave Lake Mines Sampling Program is to assist Aboriginal And Northern Development Canada-Contaminants And Remediation Directorate (AANDC-CARD) with its ongoing work to clean up abandoned mine sites across the Northwest Territories. The program aims to collect additional environmental data which will be used to confirm current site conditions and to assist with fina...


Phase III ESA - Fort Simpson RCMP Detachment
Principal Investigator: Schulz, Eva
Licensed Year(s): 2013
Summary: The main objective of the Phase III Environmental Site Assessment is to delineate the hydrocarbon contamination at the site resulting from an overflow of fuel at a vent pipe of an above ground storage tank. Test holes will be excavated with a backhoe around the former spill area in order to collect soil samples. Each sample will be submitted to a Canadian Association for Laboratory Accreditatio...


Reconnaissance Study of Smoking Hills
Principal Investigator: Dunfield, Peter F
Licensed Year(s): 2013
Summary: The objective of this work is to conduct a one day reconnaissance study of the Smoking Hills area. Mineral, rock, water and soil samples will be collected. Geochemical properties and microbial communities will be analysed in the laboratory in order to characterize any potential features unique to this site that would warrant future, more detailed research. The site will be accessed by helicopt...


PWGSC Gordon Lake Environmental Site Assessments
Principal Investigator: Nyman, Jeff
Licensed Year(s): 2013
Summary: The objective of this program is to determine the environmental and physical conditions at nine sites on Gordon Lake. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials. In addition, samples of biota (including vegetation, fish, benthic invertebrates) m...


Remediation of the Abandoned Panarctic Satellite F-68 Wellsite at Satellite Bay, Prince Patrick Island, Northwest Territories
Principal Investigator: Krizan, Julia
Licensed Year(s): 2019 2018 2017 2016 2015 2013 2011 2010
Summary: Evidence of contaminants was found in soil, groundwater and surface water at the site during investigations in 2008, 2010 and 2011. The objective of the project is to remediate the abandoned wellsite by containing and stabilizing contaminated materials in an on-site landfill, and remove debris and solid waste from the site. Talisman is proposing a two-year approach to complete the Project. Year...


Phase I/II/III ESAs and Risk Assessment
Principal Investigator: Hamilton, Melissa M
Licensed Year(s): 2013
Summary: The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...


Arctic Peatland Carbon and Holocene Warm Climates
Principal Investigator: Beilman, David W
Licensed Year(s): 2013
Summary: The research team seek to understand carbon dynamics during warm climate intervals in the Arctic: the Holocene Thermal Maximum (HTM) the warmest pre-industrial interval ranging in timing from 10 ka (thousands of years before present) with maximum seasonality to 6 ka with reduced seasonality, and the Medieval Climate Anomaly (MCA) at ~1 ka with similar seasonality as today. By studying peat cores f...


Radiological Characterization & Delineation Study - Historical Waste Contaminated Great Bear River Sites
Principal Investigator: Ceschan, Robert
Licensed Year(s): 2013
Summary: The assessment is designed to delineate the horizontal and vertical extent of uranium contaminated soil at sites located along the Great Bear River portion of the northern transportation route (NTR). The soil quality and quantity information gathered during this assessment is required to assist in the development of future remediation plans for this segment of the NTR. The proposed tasks are as...


Controls on carbon and nutrient cycling in arctic tundra
Principal Investigator: Grogan, Paul
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008
Summary: The goal of this research over the next five years is to substantially advance the understanding of how Canadian arctic tundra ecosystems function, and therefore how they are likely to be affected by perturbations such as climate change, resource development and extraction, and atmospheric pollution. Specifically, the research team will focus on the impacts on vegetation due to warmer summer tempe...


Supplemental Environmental Site Assessments along the Canol Trail, NT
Principal Investigator: Livingstone, Steve
Licensed Year(s): 2013 2012 2010
Summary: The purpose of the Supplemental Environmental Site Assessments is to further determine the current environmental and physical conditions at several petroleum hydrocarbon spill sites along the Canol Trail, and address the gaps identified from the 2012 sampling program. Key findings from these select sites will be synthesized to identify the scope and nature of the spills, potential trends regarding...


TOTAL PAGES: 22