Principal Investigator:Walmsley, Caroline Licensed Year(s):
2020
2019 Summary:
This licence has been issued for the scientific research application No.4710.
The objective is to conduct monitoring to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements.
Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This i...
Principal Investigator:Gammon, Paul R Licensed Year(s):
2019
Summary:
This licence has been issued for the scientific research application No.4544.
The objectives of this research are:
1) To investigate the environmental chemistry of the borrow pits and immediate surrounding areas to determine what, if any, environmental risk do the elevated concentrations represent;
2) To investigate the environmental chemistry of an undisturbed area around the Inuvik to Tukto...
Principal Investigator:Drolet, Andree Licensed Year(s):
2019
Summary:
This licence has been issued for the scientific research application No.4582.
These studies are to support upcoming regulatory applications for the Pine Point Project being developed by Pine Point Mining Limited (PPML).
The additional baseline studies include but are not limited to surface water quality and quantity, groundwater water quality, aquatic environment monitoring, fish and fish ha...
Principal Investigator:Charette, Matthew Licensed Year(s):
2016
Summary:
The objectives are to measure a suite of trace elements and isotopes (TEIs) in the active layer and permanently frozen layer of permafrost cores sampled near the Mackenzie River, and to compare these concentrations to those observed in submarine groundwater discharge and Mackenzie River discharge in order to determine whether permafrost-associated TEIs are being transported to the coastal Arctic. ...
Principal Investigator:Hansen, Ken Licensed Year(s):
2015
201420132012 Summary:
The study is to continue establishing the groundwater and surface water conditions within the exploration licences prior to and during oil and gas exploration activities.
Surface Water Quality Sample Collection
Collect surface water samples once, during September 2015, from a reduced number of sampling locations targeted near areas where exploration activities have occurred.
The water sampl...
Principal Investigator:Cipcigan, Paul Licensed Year(s):
2014
Summary:
The objective of the groundwater investigation is to confirm the presence or absence of contamination and to determine the risk associated with contaminated groundwater infiltration into the lake (if applicable). This work will include installing five to six monitoring wells at the site in the area adjacent to the Great Slave Lake. A secondary objective is to inspect the fuel storage tanks located...
Principal Investigator:Blowes, David W. Licensed Year(s):
2014
2013201220112010200920082005 Summary:
This research study is designed to investigate the processes related to water quality and quantity (collected at different scales) draining from country rock stockpiles that are located in areas of continuous permafrost. The quality of water draining from a country rock stockpile is determined by the combined effects of oxygen transport in the air phase, biogeochemical processes that control miner...
Principal Investigator:Nyman, Jeff Licensed Year(s):
2013
Summary:
The objective of this program is to determine the environmental and physical conditions at nine sites on Gordon Lake. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials. In addition, samples of biota (including vegetation, fish, benthic invertebrates) m...
Principal Investigator:Krizan, Julia Licensed Year(s):20192018201720162015
2013
20112010 Summary:
Evidence of contaminants was found in soil, groundwater and surface water at the site during investigations in 2008, 2010 and 2011. The objective of the project is to remediate the abandoned wellsite by containing and stabilizing contaminated materials in an on-site landfill, and remove debris and solid waste from the site.
Talisman is proposing a two-year approach to complete the Project. Year...
Principal Investigator:Hamilton, Melissa M Licensed Year(s):
2013
Summary:
The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...