39 record(s) found with the tag "groundwater" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Supplemental Environmental Site Assessments along the Canol Trail, NT
Principal Investigator: Livingstone, Steve
Licensed Year(s): 2013 2012 2010
Summary: The purpose of the Supplemental Environmental Site Assessments is to further determine the current environmental and physical conditions at several petroleum hydrocarbon spill sites along the Canol Trail, and address the gaps identified from the 2012 sampling program. Key findings from these select sites will be synthesized to identify the scope and nature of the spills, potential trends regarding...


Bosworth Creek Monitoring Project
Principal Investigator: Guthrie, Glen H
Licensed Year(s): 2011 2010 2009 2008 2007 2006
Summary: The Bosworth Creek Monitoring Project has become permanently embedded in Mackenzie Mountain School’s Experiential Science 30 Program and will continue to provide professional development for local youth through associations with academic and industrial institutions. The project will complete baseline biological and chemical data and investigate new sources of ground water that may be the result of...


2010 Baseline Studies for Avalon Rare Metals Ltd. Proposed Thor Lake Rare Earth Metals Project - Surface Water Hydrology & Groundwater
Principal Investigator: Lawson, Nick
Licensed Year(s): 2011 2010 2009
Summary: SURFACE WATER HYDROLOGY: The goal of the 2010 research program is to provide additional data that describes the existing surface water conditions at the site. This information is required for environmental assessments and water management plans for the area. Data obtained will help determine a quantitative description of the annual temporal and spatial distribution of stream flow conditions, prec...


Contaminated Site Environmental Monitoring and Assessment - Port Radium, Contact Lake and El Bonanza Historic Mining Operations
Principal Investigator: Wiatzka, Gerd M
Licensed Year(s): 2009 2008 2007 2006 2005
Summary: The project objectives include the collection of information on: water and groundwater, sediment, benthic invertebrates, fish (species presence/abundance, quality, habitat), vegetation, soil/tailings/wasterock, radiological characterization, mine openings, infrastructure and general site conditions. Environmental sampling and monitoring work at the Port Radium site is a continuation of activities ...


Mackenzie Valley Landslide Geotechnical Investigations - 2006 - ISR
Principal Investigator: Wang, Baolin
Licensed Year(s): 2008 2007 2006
Summary: Year 2 of this four-year project involves detailed mapping of landslides and collection of soil samples. Soil sampling will be carried out by digging shallow test pits with hand tools or by using a small hand-held, gas-operated coring machine. It is estimated that up to six test pits of about 1.5m diameter and about 1.5m deep will be excavated at a site; however, the total number of test pits to b...


Mackenzie Valley Landslide Geotechnical Investigations - 2006 - GSA
Principal Investigator: Wang, Baolin
Licensed Year(s): 2009 2008 2007 2006
Summary: Year 2 of this four-year project involves detailed mapping of landslides and collection of soil samples. Soil sampling will be carried out by digging shallow test pits with hand tools or by using a small hand-held, gas-operated coring machine. It is estimated that up to six test pits of about 1.5m diameter and about 1.5m deep will be excavated at a site; however, the total number of test pits to b...


Modelling the flow and storage components in the lower Liard River valley
Principal Investigator: Quinton, William L.
Licensed Year(s): 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2001
Summary: This study is a continuation of a project that began in 2001. The researchers are studying the flow and storage of water in the Scotty Creek watershed. The data they collect will help them to create a model that will do a better job of estimating the volume and timing of basin runoff in wetlands in discontinuous permafrost terrain. The information they have collected so far suggests that peat p...


Baseline Data Collection, Yellowknife Gold Project, Tyhee Development Corp.
Principal Investigator: Weagle, Ken V
Licensed Year(s): 2005 2004
Summary: The purpose of this fieldwork is for the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are 5 main components of the program. 1) Air quality and climate; General air quality will be m...


Phase II and III Environmental Site Assessment, Pointed Mountain Gas Plant and Associated Facilities
Principal Investigator: Miller, Samantha
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Tundra Hydrology and Chemistry, Daring Lake, NWT
Principal Investigator: English, Mike
Licensed Year(s): 2003 2002 2001 2000
Summary: The objectives of the research are to examine how increasing active layer depth, surficial geology, vegetation, slope and aspect impact changes in shallow groundwater and surface stream chemistry in two subbasins of the Daring Lake basin in the headwater...


TOTAL PAGES: 4