9 record(s) found with the tag "groundwater" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

TERRE-NET: Controls on the Release of Contaminants from Gold Tailings at the Giant Mine, Yellowknife, NT
Principal Investigator: Blowes, David W.
Licensed Year(s): 2024 2023 2022 2021 2020 2019 2018 2017
Summary: This licence has been issued for the scientific research application No.5447. The objectives of this project are to: 1) determine the magnitude and rate of release of arsenic and other toxic elements from the Giant Mine tailings to groundwater; 2) evaluate remediation alternatives for tailings management, including the effects of proposed engineered covers; and, 3) apply novel characterization ...


Tlicho All Season Road
Principal Investigator: Walmsley, Caroline
Licensed Year(s): 2020 2019
Summary: This licence has been issued for the scientific research application No.4710. The objective is to conduct monitoring to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements. Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This i...


ITH Metal Chemistry
Principal Investigator: Gammon, Paul R
Licensed Year(s): 2019
Summary: This licence has been issued for the scientific research application No.4544. The objectives of this research are: 1) To investigate the environmental chemistry of the borrow pits and immediate surrounding areas to determine what, if any, environmental risk do the elevated concentrations represent; 2) To investigate the environmental chemistry of an undisturbed area around the Inuvik to Tukto...


Pine Point Project
Principal Investigator: Drolet, Andree
Licensed Year(s): 2019
Summary: This licence has been issued for the scientific research application No.4582. These studies are to support upcoming regulatory applications for the Pine Point Project being developed by Pine Point Mining Limited (PPML). The additional baseline studies include but are not limited to surface water quality and quantity, groundwater water quality, aquatic environment monitoring, fish and fish ha...


EL462 & EL463 2013-2015 Surface and Groundwater Monitoring Program
Principal Investigator: Hansen, Ken
Licensed Year(s): 2015 2014 2013 2012
Summary: The study is to continue establishing the groundwater and surface water conditions within the exploration licences prior to and during oil and gas exploration activities. Surface Water Quality Sample Collection Collect surface water samples once, during September 2015, from a reduced number of sampling locations targeted near areas where exploration activities have occurred. The water sampl...


Waste rock studies at a diamond mine site
Principal Investigator: Blowes, David W.
Licensed Year(s): 2014 2013 2012 2011 2010 2009 2008 2005
Summary: This research study is designed to investigate the processes related to water quality and quantity (collected at different scales) draining from country rock stockpiles that are located in areas of continuous permafrost. The quality of water draining from a country rock stockpile is determined by the combined effects of oxygen transport in the air phase, biogeochemical processes that control miner...


PWGSC Gordon Lake Environmental Site Assessments
Principal Investigator: Nyman, Jeff
Licensed Year(s): 2013
Summary: The objective of this program is to determine the environmental and physical conditions at nine sites on Gordon Lake. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials. In addition, samples of biota (including vegetation, fish, benthic invertebrates) m...


Remediation of the Abandoned Panarctic Satellite F-68 Wellsite at Satellite Bay, Prince Patrick Island, Northwest Territories
Principal Investigator: Krizan, Julia
Licensed Year(s): 2019 2018 2017 2016 2015 2013 2011 2010
Summary: Evidence of contaminants was found in soil, groundwater and surface water at the site during investigations in 2008, 2010 and 2011. The objective of the project is to remediate the abandoned wellsite by containing and stabilizing contaminated materials in an on-site landfill, and remove debris and solid waste from the site. Talisman is proposing a two-year approach to complete the Project. Year...


Establishing a watershed framework for assessing cumulative impacts of development
Principal Investigator: Chin, Krista
Licensed Year(s): 2017 2016 2015 2014 2013
Summary: Objective 1: Build a partnership between government, communities, regulators and researchers to develop a watershed-based cumulative impact study in areas of oil and gas exploration in the Sahtu region. The Sahtu Renewable Resource Board (SRRB) can play an important coordinating role in bringing partners together and working with the communities to determine appropriate engagement in the projec...


TOTAL PAGES: 1