TERRE-NET: Controls on the Release of Contaminants from Gold Tailings at the Giant Mine, Yellowknife, NT
Principal Investigator: Blowes, David W. (24)
Licence Number: 17264
Organization: University of Waterloo
Licensed Year(s): 2024 2023 2022 2021 2020 2019 2018 2017
Issued: May 19, 2023
Project Team: David Hilger, Jeff Bain, David Blowes, Carol Ptacek, David Wilson, Sara Fellin

Objective(s): To determine the magnitude and rate of release of arsenic and other toxic elements from the Giant Mine tailings to groundwater; to evaluate remediation alternatives for tailings management, including the effects of proposed engineered covers; and, to apply novel characterization techniques to understand the mechanisms controlling arsenic release.

Project Description: This licence has been issued for the scientific research application No.5447. The objectives of this project are to: 1) determine the magnitude and rate of release of arsenic and other toxic elements from the Giant Mine tailings to groundwater; 2) evaluate remediation alternatives for tailings management, including the effects of proposed engineered covers; and, 3) apply novel characterization techniques to understand the mechanisms controlling arsenic release. The research team will install a network of piezometers within tailings impoundments at Giant Mine for the collection of groundwater samples. Key geochemical parameters, such as acidity and concentrations of dissolved chemical species, including arsenic and sulfate, will be measured. Groundwater physical parameters, including water level measurements and hydraulic conductivity will be used to calculate groundwater fluxes within and from the tailings impoundment. Pore-gas concentrations of oxygen and carbon dioxide will be measured with depth within the tailings impoundment as indicators of sulfide mineral oxidation and carbon mineral dissolution. Tailings mineralogy and microbial-community composition will be characterized in the laboratory at the University of Waterloo and other collaborating institutions. Large-scale column experiments will be conducted in the laboratory to estimate long-term rates of acid generation, acid neutralization, and the release and attenuation of trace elements in uncovered and covered tailings. Geochemical and reactive transport modelling will be integrated with field measurements to provide quantitative estimates of the longterm release of contaminants from the wastes under current conditions and following implementation of the alternative remediation strategies. The research team will provide Indigenous and Northern Affairs Canada with annual progress reports, which will include detailed research progress updates and data summaries. In addition, the results of this research will be described in academic theses, conference presentations, conference proceedings papers, and refereed journal articles. The research team will interact directly with personnel involved in site remediation at Giant Mine. Research results will be disseminated to the public via community-engagement activities; graduate students and other research personnel are willing to provide presentations to local school groups and to other members of the community through knowledge-mobilization workshops. The fieldwork for this study will be conducted from May 20, 2023 to December 31, 2023.