4 record(s) found with the tag "groundwater" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Phase I/II/III ESAs and Risk Assessment
Principal Investigator: Hamilton, Melissa M
Licensed Year(s): 2013
Summary: The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...


Supplemental Environmental Site Assessments along the Canol Trail, NT
Principal Investigator: Livingstone, Steve
Licensed Year(s): 2013 2012 2010
Summary: The purpose of the Supplemental Environmental Site Assessments is to further determine the current environmental and physical conditions at several petroleum hydrocarbon spill sites along the Canol Trail, and address the gaps identified from the 2012 sampling program. Key findings from these select sites will be synthesized to identify the scope and nature of the spills, potential trends regarding...


Contaminated Site Environmental Monitoring and Assessment - Port Radium, Contact Lake and El Bonanza Historic Mining Operations
Principal Investigator: Wiatzka, Gerd M
Licensed Year(s): 2009 2008 2007 2006 2005
Summary: The project objectives include the collection of information on: water and groundwater, sediment, benthic invertebrates, fish (species presence/abundance, quality, habitat), vegetation, soil/tailings/wasterock, radiological characterization, mine openings, infrastructure and general site conditions. Environmental sampling and monitoring work at the Port Radium site is a continuation of activities ...


Phase II and III Environmental Site Assessment, Pointed Mountain Gas Plant and Associated Facilities
Principal Investigator: Miller, Samantha
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...