6 record(s) found with the tag "groundwater" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

PWGSC Gordon Lake Environmental Site Assessments
Principal Investigator: Nyman, Jeff
Licensed Year(s): 2013
Summary: The objective of this program is to determine the environmental and physical conditions at nine sites on Gordon Lake. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials. In addition, samples of biota (including vegetation, fish, benthic invertebrates) m...


Remediation of the Abandoned Panarctic Satellite F-68 Wellsite at Satellite Bay, Prince Patrick Island, Northwest Territories
Principal Investigator: Krizan, Julia
Licensed Year(s): 2019 2018 2017 2016 2015 2013 2011 2010
Summary: Evidence of contaminants was found in soil, groundwater and surface water at the site during investigations in 2008, 2010 and 2011. The objective of the project is to remediate the abandoned wellsite by containing and stabilizing contaminated materials in an on-site landfill, and remove debris and solid waste from the site. Talisman is proposing a two-year approach to complete the Project. Year...


Phase I/II/III ESAs and Risk Assessment
Principal Investigator: Hamilton, Melissa M
Licensed Year(s): 2013
Summary: The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...


Supplemental Environmental Site Assessments along the Canol Trail, NT
Principal Investigator: Livingstone, Steve
Licensed Year(s): 2013 2012 2010
Summary: The purpose of the Supplemental Environmental Site Assessments is to further determine the current environmental and physical conditions at several petroleum hydrocarbon spill sites along the Canol Trail, and address the gaps identified from the 2012 sampling program. Key findings from these select sites will be synthesized to identify the scope and nature of the spills, potential trends regarding...


Phase II and III Environmental Site Assessment, Pointed Mountain Gas Plant and Associated Facilities
Principal Investigator: Miller, Samantha
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Dispersal of toxic substances in soil and water from an abandoned arctic waste disposal site.
Principal Investigator: Haertling, Joachim
Licensed Year(s): 1987
Summary: To assess the role of permafrost in the movement of potentially toxic substances carried in water flow over the surface and through the active layer; det. rates and amnts. of deposition of these materials in the active layer, the upper part of the permafrost zone and in the sediments and water of lakes and ponds in the vicinity of the dump; assess the changes to the nearby environ. duri...


TOTAL PAGES: 1