Principal Investigator:Hamilton, Melissa M Licensed Year(s):
2013
Summary:
The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...
Principal Investigator:Weagle, Ken V Licensed Year(s):2005
2004
Summary:
The purpose of this fieldwork is for the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are 5 main components of the program. 1) Air quality and climate; General air quality will be m...
Principal Investigator:Miller, Samantha Licensed Year(s):200620052004
2003
2002 Summary:
The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...
Principal Investigator:English, Michael C Licensed Year(s):20032002
2001
2000 Summary:
The crew will fly from Yellowknife to the Tundra Ecosystem Research Station camp on Daring Lake from BHP (Ekati Mine) by helicopter. The research team itinerary consists of: (1) setting up the camp; (2) sampling all of the major streams flowing into Daring Lake for chemistry and instantaneous flow; (3) walking through several basins to decide on an intensive sampling site; and (4) installing dri...