Principal Investigator:Colpron, Maurice Licensed Year(s):
1997
Summary:
The project will be conducted from 10-12 tent fly-camps within the study area. Each camp will be set-out by helicopter (out of Norman Wells) and will be of a duration of approximately 5-7 days. Our work will consist of daily hikes from our camps, during which our observations of the rock types and mineral occurrences will be noted on 1:50,000-scale topographic maps and air photos. Data collectio...
Principal Investigator:Good, Ron Licensed Year(s):
1994
19931993199219921991 Summary:
The researcher will conduct a geotechnical survey of the area. Components of this survey will include shallow geological drilling, geophysical downholde logging, geophysical electrical sounding and a snow depth transect. A crew will transverse the area by foot and skidoo....
Principal Investigator:Dallimore, S.R. Licensed Year(s):1990
1989
Summary:
Mr. Dallimore and his team intend to re-visit instrumented test-sites, complete mapping of surficial materials and to collect limited soil samples for analyses....
Principal Investigator:Harry, David Licensed Year(s):
1984
Summary:
A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zama pipeline. Fieldwork will focus on observations of terrain performance along the pipeline ROW following the 1983/84 winter construction season....
Principal Investigator:Lingnau, Brian Licensed Year(s):
1984
Summary:
To make qualitative and quantitative observations of the performance of the Dempster Highway and to suggest design improvements. Observations include cut/fill slope sloughing, permafrost, degradation from highway fills. Cuts, bridges and culverts, borrow pit degradation, road trafficability, road heave and subsidence and drainage disruption....
Principal Investigator:Brozowski, Jim Licensed Year(s):
1982
Summary:
To undertake a geomorphological survey of the soils, including physical and chemical characteristics....
Principal Investigator:Slater, J.E. Licensed Year(s):
1976
Summary:
To provide a sufficient data base on hydrology in order to make an adequate Assessment of the Polar Gas application. Will include: qualitative descriptions of fluvio-morphologic features of selected beaches, discharge studies, and sediment baseline data collection, an investigation of active layer hydrology, snow hydrology and the snowmelt cycle and the investigation of the physical limnology of...