9 record(s) found with the tag "geotechnical survey" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Route and Site Reconnaissance in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...


2005 Route and Site Reconnaissance in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...


2005 Route and Site Reconnaissance in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential pipeline route through the Gwich’in Settlement Area (GSA); revisit or determine the optimal locations for proposed gas compression facilities near Inuvik; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites and potential revegetation test sites;...


2005 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...


2003 Field Reconnaissance - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


2003 Field Reconnaissance - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


2003 Field Reconnaissance - Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...


2003 Field Reconnaissance - Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential campsites, borrow sources...


2002 Route and Site Selection in the Deh Cho Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Deh Cho Region; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations for poten...


TOTAL PAGES: 1