11 record(s) found with the tag "geotechnical survey" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Route and Site Reconnaissance in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...


2005 Route and Site Reconnaissance in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...


2005 Route and Site Reconnaissance in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential pipeline route through the Gwich’in Settlement Area (GSA); revisit or determine the optimal locations for proposed gas compression facilities near Inuvik; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites and potential revegetation test sites;...


2005 Winter Field Geotechnical Investigation Program in the Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...


2004 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: The geotechnical site investigation program involves drilling or excavating to collect soil samples at specific sites. This work includes drilling approximately 74 boreholes or excavations at 23 sites (18 granular deposit sites, 4 overland sites, and 1 r...


2003 Fort Simpson Summer Field Geotechnical Investigation Program - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2003
Summary: The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...


2003 Field Reconnaissance - Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


2003 Field Reconnaissance - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Field Reconnaissance - Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...


TOTAL PAGES: 2