Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2006
2006
Summary:
A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 65 people. Secondary access to the investigation s...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The objective of this study is to complete several helicopter flights for the purposes of pipeline and site reconnaissance and geotechnical observation. The activities will be conducted to: review the proposed location for a potential gas pipeline through the Sahtu Settlement Area (SSA), including identifying areas where mitigation measures may be required during or after construction such as stee...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The route and site reconnaissance activities will be used to: review the proposed location for a potential pipeline route through the Gwich’in Settlement Area (GSA); revisit or determine the optimal locations for proposed gas compression facilities near Inuvik; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites and potential revegetation test sites;...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...