Principal Investigator:Seligman, Ben Licensed Year(s):
2007
2006 Summary:
The proposed fieldwork is an expansion of previous years' fieldwork to develop a suitable knowledge base for planning and development. In addition, some routine maintenance at Camp Farewell will be conducted. The majority of the proposed work is planned for the Niglintgak area and is focused around the Gas Conditioning Facility (GCF) and the Horizontal Directional Drilling (HDD) crossing site, as ...
Principal Investigator:Widdifield, Dave Licensed Year(s):
2005
Summary:
The researchers want to learn about the ground conditions at the site by drilling up to 69 boreholes to depths ranging from 16 to 50 metres. They want to find out how thick the active layer is and find any transitions between frozen and unfrozen ground;...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
The general objective of the program is to obtain information with respect to subsurface conditions at the site by drilling up to fifty boreholes to depths ranging from sixteen to twenty metres. The specific objectives of the program are to characterize...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (north) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...
Principal Investigator:Graburn, Larry Licensed Year(s):
2003
Summary:
The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential campsites, borrow sources...