76 dossier(s) trouvé(s) portant l’étiquette "fisheries assessment" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:Dahl-Fequet, Monica L Année(s) de permis:
2005
Résumé:
The objective of this project is to collect biological and hydrological information on Hill Creek. It is unknown as to whether or not the culvert at the Hill Creek highway crossing is large enough to allow for the spring migration of spawning fish. The researchers will collect fisheries and habitat information on Hill Creek. This data will include fish presence/absence, lifestage and species com...
chercheur principal:Harris, Les Année(s) de permis:
2005
2004 Résumé:
In this study, researchers will use helicopters and radio telemetry to identify the seasonal movement patterns of Travaillant Lake broad whitefish, and their use of specific habitats and critically important areas such as those used for spawning, rearing and overwintering. For the management of fish and fisheries in the face of industrial development and exploration, it is essential to collect suc...
chercheur principal:McGurk, Michael Année(s) de permis:2005
2004
Résumé:
Colomac Gold Mine was closed in 1996 and is now under the care and maintenance of INAC. Mine water is accumulating in the Tailings Containment Area (TCA) and the mine pits and will have to be released to the environment within a few years. Under the reme...
chercheur principal:Povey, Andrew Année(s) de permis:2005
2004
2003 Résumé:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...
chercheur principal:Povey, Andrew Année(s) de permis:2005
2004
2003 Résumé:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
chercheur principal:Wytrychowski, Scott I Année(s) de permis:2004
2003
Résumé:
This study will assess the effects of blasting activity associated with proposed mining activities at the Diavik Diamond Mines Inc. Lac de Gras mine site, for which explosives would be used as the primary method of excavating rock. The resulting explosi...
chercheur principal:O'Neil, Jim Année(s) de permis:
2003
Résumé:
A fisheries/habitat assessment has been commissioned due to concerns that the proposed Deh Cho Bridge construction and operation could affect aquatic habitat and fish populations in the Mackenzie River in the vicinity of Fort Providence. This study will...
chercheur principal:Walker-Larsen, Jennifer Année(s) de permis:
2003
Résumé:
Travaillant Lake is the largest lake in the Gwich'in Settlement Area and is an important area for fish and wildlife harvesting. However, little is known about the fish populations in the lake and it is unclear whether the fish are landlocked or migrator...
chercheur principal:Hoos, Rick Année(s) de permis:20122009
2002
Résumé:
This work is being done to assist with the development of a future aquatic effects monitoring program for the mine that will meet the terms of the recently promulgated federal Metal Mining Effluent Regulations. The survey data will be provided in support...
chercheur principal:Moore, Peter Année(s) de permis:
2002
Résumé:
The objective of this study is to collect detailed baseline information on several seasonal streams and ponds on BHP Billiton's Ekati Claim Block, confirm the presence or absence of various fish species in the proposed areas, and determine their value as...