Principal Investigator:Van Gerwen-Toyne, Melanie Licensed Year(s):
2002
2000 Summary:
Peel River Fish Study - community monitors will be hired to catch and sample fish from their camps. These camps will be accessed by boat and helicopter. Monitors will catch fish with an experimental gillnet, measure fish, and remove aging structures. The...
Principal Investigator:Moore, Steve M Licensed Year(s):2002
2001
2000 Summary:
The research team (including Aboriginal members from Deline) will travel by boat from Deline to the Sahyoue/Edacho Peninsulas, and spend six days in the field collecting baseline information on wildlife and vegetation units. Twenty sites will be assessed and classified as to ecosystem type. For each site, vegetation and wildlife observations will be documented. Vegetation species present, plant ...
Principal Investigator:Palmer, Rick Licensed Year(s):
2001
Summary:
The research team will be based in Yellowknife, and transported to Prelude Lake by truck. Transport on the lake will be by 20' Alaskan boat equipped with a 55 hp motor (supplied by the North Slave Metis Alliance). Baseline information will be collected on the composition of a number of target species: Lake Trout, White Fish, Cisco, Burbot, Northern Pike and forage species. Both 30 m beach seine...
Principal Investigator:Thomas, Craig J Licensed Year(s):
2000
Summary:
This is a preliminary fisheries study to confirm 1989 baseline studies and to assist in impact assessment for Abandonment and Restoration (A & R) Plan for site closure. The researchers will conduct habitat assessments along drainages of Steeves Lake and Indin River (i.e. fish habitat mapping, assessment of habitat potential, 'spot check' confirmation of fish communities, the collection of instant...
Principal Investigator:Grabke, Dan Licensed Year(s):
2000
Summary:
In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...
Principal Investigator:Johnstone, Robin Licensed Year(s):
1999
Summary:
The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...
Principal Investigator:Machtans, Hillary Licensed Year(s):
1999
Summary:
The purpose of this study is to collect information about a variety of ecosystems contained by or in close proximity to the potential well sites for a proposed natural gas development. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies in the proposed development area. Any fish collection will be outlined by Department of Fisher...
Principal Investigator:Melton, Derek Licensed Year(s):
1999
Summary:
The overall goal of this project is to conduct preliminary baseline studies at Paramount Resources proposed gas well sites in the Fort Liard area. The wildlife program will begin with of a literature review to identify previously identified wildlife populations in the area. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies in th...
Principal Investigator:Machtans, Hillary Licensed Year(s):
1999
Summary:
The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...