Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...
Principal Investigator:Kokelj, Steven V Licensed Year(s):2004
2003
20022001200020001999 Summary:
This study investigates the physical and chemical characteristics of permafrost in the Mackenzie Delta region. The thawing of ice-rich permafrost can result in subsidence or terrain instability. Determination of thaw-sensitive terrain is required to pla...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Parlee, Brenda L Licensed Year(s):
2003
Summary:
This project involves the documentation of existing sources of traditional knowledge previously recorded with Lutsel K'e Dene First Nation through the West Kitikmeot Slave Study Society. The main focus of this project will be on social and ecological health issues, indicators and monitoring. The community of Lutsel K'e and the researcher will work together according to the terms and conditions of ...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...
Principal Investigator:Smith, Lisa Licensed Year(s):
2002
Summary:
There are three primary objectives of the study; 1) growth and yield information to assess the rate of forest growth and determine current and potential yield of various forest types; 2) NWT cumulative impact monitoring for the Western NWT Biophysical St...
Principal Investigator:Landry, Francois Licensed Year(s):
2002
Summary:
The field work is intended to provide baseline fisheries data for four lakes (Horseshoe, Toss, Fay and Logan) and to obtain post-baseline fisheries data on eight lakes (Vulture, Kodiak, Nema, Cujo, Nanuq, Counts, and Slipper) within the Ekati claimblock...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify...
Principal Investigator:Hong, Tom Licensed Year(s):
2002
Summary:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...