2 record(s) found for principal investigator "Landry, Francois" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Landry, Francois Licensed Year(s):2012
2011
Summary:
The objective of the proposed study is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area which is located in proximity to the former Pine Point Mine. Specifically, data will be collected to characterize the following environmental components: air quality, noise, hydrology, hydrogeology, geochemistry, aquatic resources, fish an...
Principal Investigator:Landry, Francois Licensed Year(s):
2002
Summary:
The field work is intended to provide baseline fisheries data for four lakes (Horseshoe, Toss, Fay and Logan) and to obtain post-baseline fisheries data on eight lakes (Vulture, Kodiak, Nema, Cujo, Nanuq, Counts, and Slipper) within the Ekati claimblock...