54 record(s) found with the tag "environmental baseline" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Permafrost and ground hazard mapping between Norman Wells and Wrigley along the Mackenzie Valley winter road using airborne geophysics
Principal Investigator: Froese, Duane G
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No. 5160. The research team will use airborne geophysics (helicopter-based surveys) flying the central Mackenzie Valley corridor along the existing winter road to map permafrost across different landforms and terrain types. The objectives of this study are to: 1) Fly multiple lines of airborne electromagnetic geophysical data ...


Yellowknife Lithium Project Environmental Consulting Services
Principal Investigator: Brezenski, Jeff
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No. 5636. The purpose of the baseline program field studies is to: characterize existing conditions in the project vicinity and surrounding region to support project planning, permitting, and development of a proposed lithium mine. One continuous air quality monitoring station will be installed to measure ambient concentratio...


De Beers - Gahcho Kué Environmental Monitoring Program
Principal Investigator: Liu, William X
Licensed Year(s): 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010
Summary: This licence has been issued for the scientific research application No.5127. The objective of the proposed studies is to implement the approved environmental monitoring and management plans to monitor any potential environmental effects from the mining activities at the Gahcho Kue Mine. The proposed studies will include the collection of air quality, geochemistry, hydrology, water and sedi...


Tlicho All Season Road
Principal Investigator: Walmsley, Caroline
Licensed Year(s): 2020 2019
Summary: This licence has been issued for the scientific research application No.4710. The objective is to conduct monitoring to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements. Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This i...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2020
Summary: This licence has been issued for the scientific research application No.4671. The main objectives of the field work for 2020 will be: 1) to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and 2) to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collect...


Environmental Baseline Surveys for the Fortune Minerals Limited NICO Project
Principal Investigator: Schryer, Richard P
Licensed Year(s): 2017 2016 2014 2013 2012 2011 2010 2009 2008 2006 2005 2004 2003
Summary: The objective of this project is to complete a Supplemental Baseline Monitoring Plan (SBMP) for water quality, fish population and benthic invertebrate programs. The SBMP contains two major study areas: Burke Lake, Reference Lake and the Marian River. Burke Lake will be the exposure area and Reference Lake will serve as the reference area for the SBMP. The exposure area for the Marian River wat...


Establishing a watershed framework for assessing cumulative impacts of development
Principal Investigator: Chin, Krista
Licensed Year(s): 2017 2016 2015 2014 2013
Summary: Objective 1: Build a partnership between government, communities, regulators and researchers to develop a watershed-based cumulative impact study in areas of oil and gas exploration in the Sahtu region. The Sahtu Renewable Resource Board (SRRB) can play an important coordinating role in bringing partners together and working with the communities to determine appropriate engagement in the projec...


EL462 & EL463 2013-2015 Surface and Groundwater Monitoring Program
Principal Investigator: Hansen, Ken
Licensed Year(s): 2015 2014 2013 2012
Summary: The study is to continue establishing the groundwater and surface water conditions within the exploration licences prior to and during oil and gas exploration activities. Surface Water Quality Sample Collection Collect surface water samples once, during September 2015, from a reduced number of sampling locations targeted near areas where exploration activities have occurred. The water sampl...


Permafrost monitoring and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006
Summary: This project continues the on-going monitoring program of permafrost and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT). This phase of the project is largely data collection. Objectives are: • To provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and improve characterization...


City of Yellowknife Gold Project
Principal Investigator: Campbell, Joseph W
Licensed Year(s): 2018 2017 2016 2015 2014
Summary: Follow-up on exploration activity associated with MVLWB land use permit MV2014C0005 on Terrax Minerals Inc. City of Yellowknife Gold Project. Work would include initial environmental baseline work, and expansion of research programs to establish sufficient study for possible future Environmental Impact Assessment of potential mine development if exploration activities are successful. Work will ...


TOTAL PAGES: 6